
Backhoe Loader
| Performance Parameters | |
| Operating weight (kg) | 8600 |
| Loader bucket capacity (m³) | 1.0 |
| Backhoe bucket capacity (m³) | 0.3 |
| Load digging force (kN) | 47 |
| Backhoe digging force (kN) | 49.8 |
| Load lifting capacity (kg) | 2500 |
| Backhoe swing angle (°) | 180 |
| Bucket dump height (mm) | 2807 |
| Backhoe dump height (mm) | 4084/4720 |
| Bucket dump distance (mm) | 801 |
| Maximum digging depth (mm) | 4303/5246 |
| Digging depth (bucket) (mm) | 30 |
| Maximum traction force (kN) | 76 |
| Engine model | WP3.6NG101E680 / WP4G95E221 / YC4A105Z-T20 / WP3.6NG112E680 / YC4A110Z-T23 |
| Engine manufacturer | Weichai Euro V / Weichai China II / Yuchai China II |
| Engine type | Inline / turbocharged / water-cooled / direct injection |
| Displacement (L) | 3.6 / 4.8 / 4.5 |
| Number of cylinders | 4 |
| Bore (mm) | 98 / 100 / 108 / 105 |
| Stroke (mm) | 120 / 114 / 132 / 130 |
| Engine rated speed (rpm) | 2400 / 2200 |
| Rated power (kW) | 74.5 / 82 / 74 / 82 / 74 / 70 |
| Maximum torque (N·m) | 450 / 430 / 450 / 400 / 425 / 380 |
| Maximum torque speed (rpm) | 1500 / 1400-1600 / 1400-1700 |
| Intake type | Turbocharged |
| Maximum travel speed (km/h) | 39 |
| Minimum turning radius (mm) | 6581 |
| Steering angle (°) | ±41 |
| Steering type | Hydraulic steering |
| Steering gear model | BZZ-250 |
| Working pump displacement (ml/r) | 63 |
| Working pump model | SGP2063 |
| Loading system pressure (MPa) | 20 |
| Digging system pressure (MPa) | 20 |
| Steering system pressure (MPa) | 14 |
| Drive axle | |
| Drive axle model | 26.22-1920 / 28.43M-1654 |
| Drive axle manufacturer | Carraro (Italy) |
| Rated front axle load (T) | 22.5 |
| Rated rear axle load (T) | 18.75 |
| Transmission system | |
| Transmission type | Countershaft power shift |
| Transmission model | TLB1-4WD |
| Number of gears | 4F / 4R (4 forward, 4 reverse) |
| Torque converter | Carraro |
| Cooling method | Oil-cooled pressure circulation |
| Overall dimensions | |
| Overall dimensions L×W×H (mm) | 6050 × 2484 × 3453 |
| Wheelbase (mm) | 2280 |
| Track width (mm) | 1785 |
| Minimum ground clearance (mm) | 300 |
| Tires | |
| Tire specification (front/rear) | 14-17.5 / 19.5L-24 |
| Front tire pressure (MPa) | 0.4 |
| Rear tire pressure (MPa) | 0.35 |
| Brake system | |
| Service brake | Wet internal self-adjusting self-balancing |
| Parking brake | Manual brake |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.