Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Daily dozer inspection is not about copying the manual line by line; it is about focusing on vulnera···
For long-shift continuous dozing scenarios, this discusses the trade-off logic of power output modes···
When selecting a blade for a medium dozer, a common problem is not knowing which job each blade type···
In soft ground and wetland operations, wetland-type bulldozers are often regarded as a universal sol···
Before a heavy bulldozer arrives, site conditions and documentation confirmation often determine whe···
In heavy dozing for mining and large earthworks, undercarriages endure significantly higher impact l···
Small-scale site leveling is often constrained by tight space and fragmented work sequences. This ar···
Ground pressure is often treated as just another parameter, but it actually answers whether equipmen···
During continuous reverse dozing on narrow sites, operator effort mainly comes from frequent directi···
When purchasing a dozer, product literature often places multiple variants, optional attachments, an···
In roadbed fill dozing, the difficulty often lies not in single-pass pushing force but in whether ha···
Pushing, spreading and compaction-leveling at a landfill are not the same as ordinary earthmoving. T···
Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.