
Hydraulic Breaker
The ME1000 features a high-strength structural frame design secured by industrial-grade through-bolts to ensure absolute alignment of internal components. This rigid assembly is specifically engineered to counteract the extreme torsional stress generated during the high-impact cycles of the 850KG hammer. By minimizing structural flex and vibration, this design prevents fatigue-related cracking and ensures long-term durability in harsh quarry and demolition environments.
The ME1000 is equipped with an advanced large-bore valve system capable of managing hydraulic oil flow between 80-110 L/min with surgical precision. This responsive control mechanism ensures a consistent striking rhythm even under temperature fluctuations. By optimizing hydraulic distribution within the 150-170 KG/cm² pressure range, the system prevents energy spikes and protects the excavator's hydraulic seals from premature wear.
To protect the carrier machine, the ME1000 is fitted with a large-capacity nitrogen accumulator designed for rapid energy recovery. This system captures the hydraulic peaks generated by each impact of the 100 mm chisel and redirects that energy into the next strike, significantly increasing impact force. At the same time, it acts as a superior buffer, protecting the excavator's main pump and arm from destructive recoil forces.
At the core of the ME1000 is a precisely aligned high-speed piston designed to deliver devastating kinetic energy. By perfectly synchronizing the piston stroke with the 100 mm diameter tool, the breaker achieves an unmatched power-to-weight ratio. This optimized striking power enables the 850KG unit to shatter reinforced concrete and high-density rock formations in fewer blows, dramatically improving on-site productivity.
The inner cylinder of the ME1000 is made from special alloy steel with a mirror-polished bore that minimizes mechanical friction. This advanced construction reduces heat buildup, which is a primary cause of internal seal failure in heavy-duty breakers. The reinforced cylinder housing provides a protective shell against external impact and debris, ensuring the internal power unit remains in pristine condition during continuous mining tasks.
The ME1000 comes standard with a large 100 mm diameter chisel designed for deep-hole penetration in the hardest materials. Each alloy steel tool undergoes a proprietary deep-hardening carburizing process that gives it an indestructible outer shell and a resilient shock-absorbing core. Whether using a moil point for rock scaling or a wedge for concrete splitting, this 100 mm penetrator maintains its structural edge longer than conventional tools.
The front head assembly of the ME1000 uses a multi-layer thrust support system to absorb the enormous reaction forces generated during heavy rock breaking. By isolating the feedback from the 100 mm chisel, this design prevents harmful energy from returning to the breaker body and the excavator boom. This structural insulation is key to the ME1000's reputation for extremely high reliability and reduced operator fatigue during 24/7 operations.
The ME1000 hydraulic breaker is a premium 850KG-class attachment designed for excavators in the 15 to 20 ton range. It represents the pinnacle of medium heavy-duty demolition technology, combining a massive 100 mm chisel with high-pressure efficiency (150-170 KG/cm²). Engineered for maximum impact energy and structural resilience, the ME1000 is the best choice for contractors who require extremely high breaking capability and absolute reliability for high-stakes industrial challenges.
This 850KG power station is ideal for a variety of professional environments, including primary rock breaking in large quarries, bridge deck demolition, and large-scale residential demolition. Its 100 mm chisel makes it highly effective for foundation excavation, utility trenching through hard bedrock, and mountainous site clearance. Whether you are breaking through basalt, granite, or reinforced concrete structures, the ME1000 delivers the unstoppable power required for world-class construction and mining projects.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.