
Hydraulic Breaker
The ME1650 features an ultra-heavy-duty 3380KG structural frame designed specifically for the extreme demands of 35-ton class excavators. This massive chassis provides the necessary counterweight and stability to handle high-frequency, high-energy impacts without structural fatigue. By employing premium reinforced steel plates, the ME1650 ensures absolute alignment of the internal cells even during the most intense primary rock-breaking cycles in open-pit mines.
The ME1650 is equipped with a next-generation large-bore valve assembly designed to handle massive hydraulic flow of up to 260 L/min with surgical precision. This high-throughput system minimizes oil turbulence and back pressure, ensuring that the hydraulic power of 33-38 ton carriers is converted into impact energy at maximum efficiency. This advanced flow management enables a consistent, devastating strike rhythm that significantly increases productivity.
Unlike standard breakers, the ME1650 operates in the ultra-high-pressure range of 210-220 KG/cm², specifically engineered for breaking the hardest geological formations. This increased operating pressure provides the explosive force needed to shatter high-density basalt, granite, and reinforced concrete bridge piers. By optimizing the pressure-to-impact ratio, the ME1650 delivers concentrated energy bursts that streamline the most challenging demolition tasks.
The ME1650 comes standard with a giant chisel with a diameter of 165 mm and an optimized length of 1500 mm for deep core penetration. Each tool is manufactured through a proprietary multi-directional forging process that refines the steel's grain structure for ultimate strength. This 165 mm power chamber provides the absolute mass required to propagate shock waves deep into hard rock, ensuring rapid breaking and extended tool life under abrasive conditions.
To protect your high-value 33-38 ton machinery, the ME1650 is equipped with a high-capacity nitrogen energy-recovery system. This advanced accumulator captures the excess pressure generated by each massive impact and redirects it into the next downward strike, recovering energy to produce a more powerful impact force. At the same time, it eliminates hydraulic pulsation, protecting the excavator's main pump and boom components from destructive feedback forces.
At the core of the ME1650 is a massive precision-ground piston designed for maximum momentum transfer. By synchronizing the piston's weight and long-stroke motion with the 165 mm chisel, the breaker achieves unparalleled kinetic energy transfer. This optimized power enables the 3.4-ton unit to pulverize massive boulders with fewer impacts, significantly reducing fuel consumption and operating time on world-class engineering sites.

The front head of the ME1650 is made of ultra-high-density forged alloy steel to support the 165mm tool under extreme stress. This mining-grade structure uses an ultra-thick thrust ring and a high-wear-resistant bushing to effectively suppress violent vibration during large-scale operations. This reinforced design minimizes internal wear and protects the main cylinder housing, ensuring unparalleled reliability in the dustiest and most abrasive environments.
The ME1650 hydraulic breaker is a premium 3380KG-class attachment designed for heavy-duty excavators in the 33 to 38 ton range. With its massive 165 mm chisel and ultra-high-pressure efficiency, it represents the pinnacle of heavy demolition technology. Engineered for maximum impact energy and structural longevity, the ME1650 is the ultimate choice for contractors who demand unstoppable breaking capability and absolute reliability on the most challenging global infrastructure and mining projects.
This 3.4-ton power station is ideal for primary rock breaking in large quarries, large open-pit mining operations, and demolition of heavy reinforced concrete structures. It excels at breaking through the hardest materials such as basalt, granite, and thick bridge foundations. Its deep-penetration 1500 mm chisel makes it ideal for large tunnel excavation, high-capacity site preparation, and underwater demolition in port engineering, providing the power required for world-class construction challenges.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.