
Hydraulic Breaker
The ME1750 is built with a massive 3.9-ton frame designed to withstand the extreme torsional stress generated during primary quarrying and mining. The structure is reinforced with high-density alloy steel plates and oversized diameter through bolts, providing an extremely stable foundation for the 175mm tool. This reinforced architecture ensures perfect internal alignment during the toughest 24/7 shifts, preventing structural fatigue in the world's most demanding environments.
Designed to integrate seamlessly with the world's most powerful heavy-duty excavators, the ME1750 features an ultra-flow internal manifold capable of handling up to 290 liters per minute with zero turbulence. This high-capacity hydraulic inlet ensures that the raw power of 38-48 ton carriers is converted into high-frequency impact energy with maximum efficiency, delivering unstoppable demolition force that maintains its rhythm even under hydraulic temperature fluctuations.
Operating within the industry-leading extreme pressure range of 210-230 KG/cm², the ME1750 is specifically calibrated to pulverize the densest and most stubborn geological formations. This immense pressure output provides the explosive force needed to shatter high-silica rock, basalt, and reinforced concrete bridge foundations. By optimizing the pressure-to-strike ratio, the ME1750 streamlines the most challenging large-scale infrastructure projects.
The ME1750 is equipped with a giant 175mm diameter chisel extended to 1600mm in length for unparalleled penetration depth. Forged through a proprietary multi-directional hardening process, this massive alloy armor-piercing chisel maintains its structural edge under immense heat and impact pressure. It is designed to propagate massive shockwaves deep into solid bedrock, enabling rapid fragmentation of granite and other high-density materials.
To protect high-value 38-48 ton excavators, the ME1750 incorporates a state-of-the-art recoil management system and a high-capacity nitrogen buffer. This system effectively absorbs the massive feedback shockwaves from each 175mm impact, protecting the carrier's boom, arm, and hydraulic seals from premature fatigue. This dual-action technology also recovers energy to produce a more explosive downward strike, increasing impact force without additional fuel consumption.
At the core of the ME1750 is a precision-ground heavy-duty piston engineered for maximum momentum transfer. By synchronizing the piston's immense mass with the high-pressure hydraulic cycle, the breaker delivers explosive impacts that fragment material in significantly fewer blows. This optimized dynamic is essential for boosting productivity in primary mining and large-scale earthmoving operations.
The front head of the ME1750 is a reinforced masterpiece, featuring a specially made thrust ring and ultra-thick wear-resistant bushings to suppress intense vibration during massive rock breaking. This armored assembly effectively isolates the main power cell from harmful impact feedback, ensuring consistent performance and structural longevity under highly abrasive conditions. This reinforced design is key to the ME1750's reputation for exceptional reliability on world-class projects.
The ME1750 hydraulic breaker represents the absolute pinnacle of heavy-duty demolition technology, designed for large mining excavators in the 38 to 48 ton range. With its massive 3950 kg operating weight and giant 175mm chisel, it delivers unstoppable impact force that redefines industrial productivity. Engineered for maximum structural resilience and energy efficiency, the ME1750 is the ultimate choice for global contractors who need the most powerful and reliable rock hammer to tackle the planet's toughest industrial challenges.
This 3.9-ton Titan is ideal for the most demanding environments, including primary rock breaking in large open-pit mines, tunnel excavation through hard bedrock, and demolition of large reinforced concrete bridge structures. Its chisel with a penetration depth of 1600mm makes it exceptionally effective for underwater bedrock removal in port construction and mountainous site preparation. Whether handling granite, basalt, or reinforced foundations, the ME1750 delivers the unstoppable power needed to meet world-class construction and mining challenges.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.