
Hydraulic Breaker
The ME1950 is a titan-class 5820KG hydraulic breaker specially designed for seamless integration with 50-60 ton heavy-duty excavators. The power chamber structure uses high-strength alloy steel plates and oversized through-bolts to maintain absolute internal alignment under the extreme torsional stress of primary mining. The chassis is custom-balanced to match the hydraulic output and boom strength of the 50-60 ton class, ensuring ultimate stability during large-scale rock breaking.
Designed for the extreme hydraulic capacity of 50-60 ton carriers, the ME1950 features an advanced large-bore manifold capable of handling flow rates up to 310 liters per minute. This precision-engineered valve system minimizes internal fluid friction and heat generation, enabling lightning-fast response even at maximum flow. By precisely managing fluid dynamics, it ensures that the carrier's massive hydraulic output is converted into rhythmic, devastating impact frequency shifts time after time.
Operating within an extraordinary pressure range of 260-280 KG/cm², the ME1950 delivers explosive impact force that pulverizes the densest geological formations on earth. This high-pressure calibration is specifically tuned to easily break high-silica granite and solid basalt. By maximizing the energy density of each blow, the ME1950 gives 50-60 ton excavators the power needed to handle world-class mining and infrastructure projects with absolute efficiency.
To protect high-value 50-60 ton machinery, the ME1950 adopts a state-of-the-art recoil management system and a large-capacity nitrogen energy buffer. This system effectively absorbs the massive feedback shock waves generated by each impact, protecting the carrier's boom, arm, and hydraulic seals from premature fatigue. At the same time, it recovers recoil energy into the next downward stroke, increasing impact force without consuming extra fuel, providing a smarter approach to handling large-scale demolition.
At the core of the ME1950 is a precision-ground ultra-high-mass piston designed for maximum momentum transfer in a 5.8-ton unit. By synchronizing the piston's immense mass with ultra-high-pressure hydraulic cycles, the breaker achieves high-speed impact that breaks materials in significantly fewer blows. This optimized dynamic is essential for improving production efficiency in primary mining, large-scale quarrying, and industrial demolition operations.
The front head of the ME1950 is a masterpiece of reinforcement, featuring a specially made thrust ring and ultra-thick wear-resistant bushing that suppress intense vibration during large-scale rock breaking. This armored assembly effectively isolates the main power cell from harmful impact feedback, ensuring consistent performance and structural longevity in highly abrasive mining environments. This reinforced design is key to the ME1950's reputation for absolute reliability in the world's toughest excavation projects.
The inner cylinder of the ME1950 is made of specially forged alloy steel, featuring a mirror-finished bore and a proprietary multi-seal system. This advanced structure prevents oil leakage even under extreme pressures of 280 KG/cm² and blocks the ingress of abrasive mining dust. The precision-polished power chamber ensures the piston operates with the highest accuracy, maintaining optimal performance during continuous 24/7 operation in high ambient temperature environments.
The ME1950 hydraulic breaker represents the ultimate pinnacle of ultra-heavy-duty demolition technology, specifically optimized for large excavators in the 50 to 60 ton range. With its massive 5820KG operating weight and industry-leading pressure efficiency, it delivers unstoppable impact force that redefines industrial productivity in mining and heavy infrastructure. Designed for maximum structural resilience and energy efficiency, the ME1950 is the best choice for global contractors who need the most powerful and reliable rock hammer to tackle world-class industrial challenges.
This 5.8-ton titan is ideal for the most demanding global environments, including primary rock breaking in large open-pit mines, tunnel excavation through hard bedrock, and demolition of large reinforced concrete bridge foundations. It is the ideal partner for 50-60 ton excavators in port construction, large-scale site preparation, underwater bedrock removal for mountain road projects, and more. The ME1950 provides the unstoppable power needed to handle granite, basalt, and high-density geological formations with absolute reliability and efficiency.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.