
Hydraulic Breaker
The ME450 features high-strength, hardened through-bolts that provide a rigid structural backbone. This dedicated design ensures the breaker body remains perfectly aligned even under high-frequency impact. By preventing accidental cracking and structural bending, these bolts significantly improve machine reliability and reduce long-term maintenance costs under harsh working conditions.
The ME450 is equipped with a precision internal valve assembly that precisely manages hydraulic flow between 20-40L/min. This responsive control system ensures a consistent striking rhythm and prevents hydraulic oil overheating. The simplified valve structure not only provides responsive operation but also enables faster routine inspection and easier maintenance.
The ME450 features an advanced internal accumulator assembly that acts as a high-performance pressure buffer. It effectively absorbs hydraulic peaks and pulsations within the circuit, protecting the excavator's sensitive hydraulic pump and seals. This ensures smooth energy output and consistent impact force while extending the overall service life of the machine.
As the core power unit, the ME450 cylinder uses a mirror-polished bore to minimize friction and heat buildup. This precision-engineered cylinder ensures the piston operates with maximum accuracy on every stroke. The robust housing further protects the cylinder from external debris, ensuring stable performance during continuous demolition tasks.
The ME450 uses a precision-machined piston that converts hydraulic energy into powerful kinetic impact force while minimizing power loss. With a stroke perfectly matched to the 45mm chisel, the system delivers concentrated punching action that efficiently crushes concrete and rock. This efficient design enables faster material penetration while optimizing the fuel consumption of the carrier excavator.
To protect the main body, the ME450 uses a heavy-duty front head with a multi-layer thrust support system. This structure uses premium thrust rings and bushings to absorb the intense recoil generated by the material. This structural isolation effectively insulates the main cylinder from harmful feedback, significantly reducing wear on internal components.
The ME450 is equipped with a highly durable 45mm diameter chisel that undergoes a strict multi-stage heat treatment process. This creates an extremely hard surface that can break tough materials while maintaining a resilient core to prevent breakage. The tool is available with a variety of tip styles to ensure consistent breaking performance across various industrial applications.
The ME450 hydraulic breaker is a premium 105KG-class attachment designed for small and medium excavators. It is equipped with a powerful 45mm chisel and optimized for an operating flow of 20-40 L/min, achieving a perfect balance between lightweight maneuverability and high impact energy. It is a reliable, efficient solution for professional contractors who need a durable tool for precise demolition without requiring large heavy machinery.
This 105KG power unit is ideal for a variety of professional environments, including urban sidewalk removal, residential basement renovation, and utility trenching. Its compact size and 45mm chisel make it particularly effective for landscaping rock breaking, pool excavation, and working in limited indoor spaces. Whether you are dealing with frozen ground or reinforced concrete, the ME450 delivers the versatile power needed to meet modern construction challenges.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.