
Small Bulldozer
Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Medium Bulldozer
Tonnage: 13–23 t
Balanced power, broad application and good value.
Large Bulldozer
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Mini Excavator
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Small Excavator
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Medium Excavator
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Large Excavator
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Wheeled Excavator
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Small Loader
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Medium Loader
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Large Loader
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Skid Steer Loader
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Backhoe Loader
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Small Pipe Layer
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Medium Pipe Layer
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Large Pipe Layer
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Single Drum Vibratory Road Roller
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Double Drum Road Roller
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Pneumatic Tire Roller
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Mini Road Roller
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Landfill Compactor
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.

Expert support · Worldwide shipping








Hydraulic Trommel Screen
| GS-35 Hydraulic Rotary Screening Bucket | |
| Model | GS-35 |
| Suitable Excavator (T) | 26-40 |
| Machine Weight (kg) | 2800 |
| Bucket Capacity (m³) | 2 |
| Screen Size (mm) | Customizable |
The drum body is made of high-strength wear-resistant steel, effectively extending service life and reducing replacement frequency. The unique inclined-angle design, combined with an internal spiral blade structure, enables efficient tumbling and grading of materials during rotation, greatly reducing screen clogging.
In addition to basic soil and stone separation, the GS35 can also be widely used in construction waste recycling, mining aggregate washing, river dredging, and environmental screening projects. Its modular screen design allows users to quickly replace screen plates with different aperture sizes according to actual output particle size requirements, improving equipment utilization.
The equipment connects directly to the excavator via a standard hydraulic interface and can be put into operation without an additional power source. It is recommended to regularly clean accumulated material inside the drum, check the sealing of hydraulic lines, and apply high-temperature-resistant grease to lubrication points. Maintain a steady feed rate during operation and avoid violent impact on the screen body to ensure long-term stable operation.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.