
Hydraulic Pulverizer
The RP220 hydraulic pulverizer is designed specifically for 20-30 ton excavators. With a total weight of 2330KG, working pressure of 300-320 KG/cm², working flow of 200-250L/MIN, and tool diameter of 750mm, it delivers efficient crushing, concrete demolition, and rebar separation on construction and recycling sites.
The MERP220 has a total weight of 2330KG and features a reinforced heavy-duty frame that ensures stable operation, reduces vibration, and withstands long-term demanding demolition work.
The 300-320 KG/cm² working pressure provides powerful and stable crushing force, efficiently breaking concrete, floor slabs, walls, and building structures.
The 200-250L/MIN working flow matches excavator hydraulic systems perfectly, ensuring smooth jaw movement, fast response, and low energy loss.
The 750mm tool diameter provides a wide working range, enabling the pulverizer to handle large concrete blocks and improve overall demolition efficiency.
Designed specifically for 20-30 ton excavators, it ensures easy installation, even force distribution, and ideal working performance across various carriers.
High-strength wear-resistant blades and reinforced components provide excellent impact resistance and wear resistance, reducing maintenance costs and extending service time.
The optimized jaw structure quickly separates concrete and rebar during demolition, greatly improving material recovery efficiency and reducing waste.
The RP220 hydraulic pulverizer is a high-performance attachment built for 20-30 ton excavators, combining strong crushing force, stable structure, large working diameter, and excellent durability. It is widely used in building demolition, renovation projects, and concrete recycling, providing reliable and efficient performance for construction and demolition teams.
The RP220 hydraulic pulverizer is a professional and reliable attachment for 20-30 ton excavators, ideal for building demolition, renovation projects, and concrete recycling. Its powerful crushing performance, large working diameter, stable structure, and perfect machine compatibility make it a cost-effective choice for construction and demolition teams seeking high efficiency and long service life.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.