
Hydraulic Shear
The MERT280 uses a large structural frame weighing 2650 kg, specially reinforced to withstand the extreme torsional forces encountered by 25-35 ton excavators. This high-strength alloy steel structure provides the ultimate rigid foundation for industrial-scale scrap processing. By counteracting structural bending during intense cutting cycles, the MERT280 ensures absolute stability and long-term durability in the most demanding demolition environments.
Operating within an extraordinary pressure range of 300-340 KG/cm², the MERT280 delivers devastating cutting force designed to cut thick steel beams and reinforced structures. This high-pressure hydraulic calibration enables clean, efficient shearing with minimal effort. By maximizing the energy density at the blade edge, it provides professional contractors with the power needed to handle large-scale industrial scrap and shipbreaking projects.
The MERT280 features a specialized jaw design with a 580mm opening and 620mm depth, allowing it to accommodate large steel profiles and bulky scrap. This deep-throat geometry ensures that material is pulled deep into the cutting zone where leverage is highest. This optimization significantly increases the amount of material processed per cycle, making it ideal for high-stakes demolition and recycling tasks.
The MERT280 is equipped with high-performance, precision-ground blades made from specially heat-treated alloy steel that maintain a sharp edge under continuous heavy-duty use. The four-way indexable and replaceable blade system ensures minimal downtime and a lower total cost of ownership. These industrial-grade cutting edges are designed to resist chipping and dulling, ensuring consistent shearing performance across various steel grades.
To ensure maximum operational flexibility, the MERT280 uses a heavy-duty rotation motor that provides 360-degree infinite hydraulic rotation. This allows the shear to be precisely positioned at any angle, making it particularly effective for complex industrial dismantling and elevated cutting. Smooth rotation control enables operators to work around obstacles, significantly improving on-site productivity and safety.
The advanced hydraulic manifold of the MERT280 is designed for fast cycle times and efficiently handles large flows between 200-300 L/min. This high-throughput system enables lightning-fast opening and closing speeds, allowing operators to maintain a rhythmic and efficient shearing workflow. Optimized internal fluid dynamics also help maintain stable oil temperatures during continuous, high-intensity operation in scrap yards.
The MERT280 features a fully shielded high-force hydraulic cylinder designed for heavy-duty shearing applications. The protective armor prevents falling debris and sharp scrap metal from damaging the cylinder rod and sensitive hydraulic seals. By protecting the core power unit, this design significantly reduces the risk of leaks and unexpected downtime, ensuring the shear remains reliable even in the most hazardous demolition areas.
The MERT280 hydraulic shear is a professional-grade 2650KG-class attachment specifically optimized for heavy-duty excavators in the 25 to 35 ton range. With its 620mm deep jaw and ultra-high cutting pressure of 340 KG/cm², it represents the industry standard for large steel demolition. Designed for maximum structural resilience and precise rotation, the MERT280 provides contractors with a reliable heavy-duty tool that ensures maximum productivity and unmatched industrial recycling efficiency.
This 2.6-ton powerhouse is ideal for a variety of professional environments, including industrial scrap yard processing, bridge demolition, and shipbreaking operations. Its deep-penetration blades and wide 580mm opening make it exceptionally effective for cutting H-beams, reinforced concrete columns, and large-diameter steel pipes. Whether you are clearing industrial sites or sorting scrap metal for recycling, the MERT280 delivers the unstoppable power and precision required for modern heavy-duty demolition challenges.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.