
Landfill Compactor
♻️The C300H is a self-propelled articulated four-roller refuse compactor belonging to the ultra-heavy-duty compaction equipment category. It features strong gradeability, excellent compaction performance, and high working efficiency. It is mainly used for pushing, leveling, and compacting waste piles in landfills, and is also suitable for filling and compacting cohesive materials in highway, airport, port, wharf, dam, and various industrial construction site operations.
The C300H is powered by a Shangchai China III water-cooled turbocharged diesel engine with a rated power of 192kW, delivering strong power output and excellent gradeability. It operates stably and reliably even in harsh and complex landfill environments.
This compactor adopts high-strength wear-resistant cutting teeth, achieving a compaction and spreading depth of more than 1 meter. This greatly improves working efficiency, increases waste compaction density, and enables high-intensity compaction operations in landfills.
It features an extra-wide and extra-high dozer blade design, providing a large-capacity pushing effect in a single pass. This design effectively reduces empty travel time and significantly improves overall waste pushing efficiency.
It adopts the mature WG-type torque converter and power-shift transmission, featuring a wide range of applications, stable performance, high reliability, and easy maintenance. The transmission system is widely recognized and trusted by customers at home and abroad.
The pump unit is equipped with a high-performance centralized lubrication system that automatically and regularly lubricates 12 key working points. Operators no longer need to enter the cab for manual lubrication, greatly saving maintenance time and improving energy efficiency.
The C300H features an ergonomic fully enclosed cab with standard heating and optional air conditioning. It adopts high-level air intake with an activated carbon filter, effectively isolating odors and dust and protecting the driver's physical and mental health in harsh landfill environments.
Equipped with a stainless steel chemical tank and a powered spray mechanism, it can effectively eliminate mosquitoes and bacteria in waste sites. It provides a hygienic, clean, and environmentally friendly operating solution for landfills.
It adopts four-wheel walking drive, a large-tonnage PR75-37 drive axle, and a rear-wheel proportional differential lock. When one side wheel slips, the other side still maintains stable power output, ensuring strong driving force and passability on muddy and soft ground.
It adopts an imported pump assembly and load-sensing hydraulic system, supporting priority steering function. The hydraulic system is light, reliable, responsive, efficient, and energy-saving, ensuring smooth and precise operation.
Equipped with a maintenance-free battery, it offers excellent low-temperature working performance and a long service life, reducing daily maintenance workload and ensuring stable starting under all-weather conditions.
The C300H refuse compactor achieves two functions in one machine: pushing waste and compacting waste simultaneously during landfill operations. This greatly improves construction efficiency and reduces the user's equipment investment cost.
Equipped with a safe and reliable roll-over protective structure (ROPS), it can effectively protect the driver's personal safety in the event of accidental rollover or falling objects, fully meeting international safety operation standards.
| Main Technical Parameters | |
| Model | C300H |
| Operating Weight (kg) | 29100 |
| Compaction Width (mm) | 3430 |
| Maximum Travel Speed (km/h) | 11 |
| Gradeability (%) | 100 |
| Front/Rear Axle Distance (mm) | 3500 |
| Minimum Ground Clearance (mm) | 490 |
| Dozer Blade Height (mm) | 1880 |
| Roller Width (Front/Rear) (mm) | 1195 / 970 |
| Roller Diameter (Front/Rear) (mm) | 1620 / 1620 |
| Number of Roller Teeth (Front/Rear) | 50×2 / 40×2 |
| Engine Brand | Shangchai |
| Emission Level | Tier 3 |
| Engine Power (kW) | 192 |
| Length (mm) | 8100 |
| Width (mm) | 3800 |
| Height (mm) | 3670 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.