
Large Excavator
The SH330 is a powerful 33-ton-class hydraulic excavator designed for the harshest high-intensity construction and mining environments. Equipped with a large-capacity 1.6 m³ bucket and a high-torque engine, it delivers an outstanding combination of raw digging power, extensive operating range, and long-term structural durability.
The SH330 is equipped with a professional-grade 6CTA8.3 engine with a stable rated power of 194kW. Featuring a high power reserve design, this engine ensures the machine easily handles heavy excavation, steep climbing, and high-load cycles while maintaining consistent performance under the most complex geological conditions.
With a bucket digging force of 244kN and an arm force of 200kN, supported by a 35MPa high-pressure system, the SH330 offers industry-leading penetration. This exceptional cutting capability significantly accelerates earthmoving and material loading processes, effectively shortening project timelines and maximizing return on investment.
The SH330 offers an impressive working range, including a maximum digging radius of 10,709 mm and a digging height of 10,491 mm. Its exceptional working range and 7,625 mm dumping height make it ideal for deep foundation work, high-arm truck loading, and long-distance material handling.
The machine features a high-flow, high-pressure hydraulic configuration that enables smooth swing speeds of 0-11 rpm. The system is designed for fluid multi-function synchronization and precise control, reducing mechanical shock during start and stop for improved safety and operator comfort.

Designed for harsh environments, the SH330 boasts a 35° gradeability and a high minimum ground clearance of 470 mm. Combined with a long 3,800mm wheelbase, the machine provides excellent stability and passability across mountainous, muddy, and mining terrain.
The structure features a reinforced heavy-duty design with additional reinforcement at key stress points. High-quality materials and automated robotic welding ensure the undercarriage and arm can withstand thousands of hours of high-intensity stress, significantly reducing downtime and maintenance costs.
The machine is a true "all-rounder" for large-scale projects such as open-pit mining, large earthworks, infrastructure foundations, water conservancy projects, and port cargo handling. It is the ideal choice for any operation requiring a balance of heavy-duty power and agile control.



📊 Performance Parameters | |
| Bucket Capacity (m³) | 1.6 |
| Swing Speed (rpm) | 0-11 |
| Maximum Gradeability (°) | 35 |
| Maximum Bucket Digging Force (kN) | 244 |
| Maximum Arm Digging Force (kN) | 200 |
| Engine Model | 6CTA8.3 |
| Rated Power/Speed (kW/rpm) | 194/2200 |
| Tire Model | - |
| System Pressure (MPa) | 35 |
🏗️ Working Range | |
| Maximum Digging Height (mm) | 10491 |
| Maximum Dumping Height (mm) | 7625 |
| Maximum Digging Depth (mm) | 6437 |
| Maximum Vertical Digging Depth (mm) | 5831 |
| Maximum Digging Radius (mm) | 10709 |
| Minimum Swing Radius (mm) | 3643 |
📏 Overall Dimensions | |
| Overall Dimensions L*W*H (mm) | 11015*3200*3168 |
| Cab Height (mm) | 3168 |
| Wheelbase (mm) | 3800 |
| Wheel (Track) Gauge (mm) | 2590 |
| Minimum Ground Clearance (mm) | 470 |
| Tail Swing Radius (mm) | 3480 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.