
Large Excavator
The SH380 is a high-performance 38-ton-class hydraulic excavator meticulously designed for large earthmoving, heavy-duty mining, and major infrastructure projects. Featuring a large 1.7 cubic meter bucket and advanced structural reinforcement, it delivers superior power, extensive operating range, and rock-solid reliability for the most demanding job sites.
The machine is equipped with an SL9 engine rated at 219kW, providing ample power reserve. With advanced turbocharging technology, it maintains stable and powerful performance even in complex environments such as high altitudes. The optimized thermal management system ensures efficient engine operation during long, high-intensity shifts.
The 35MPa high-pressure hydraulic system uses industry-leading main pumps, valves, and swing motors, with dual-pump confluence technology. This ensures faster response times for the boom and arm while providing smooth swing start and stop and ample torque reserve for precise, efficient operation.
With a bucket digging force of 244kN and an arm force of 200kN, the SH330 excels in heavy-load digging. Its impressive working range (maximum digging radius of 11,178 mm and digging depth of 7,372 mm) allows it to easily handle deep foundation work and massive material handling.
Built to last, the machine features an integrally welded boom that has been precision bored and shot-peened. Key arm articulation points use forged structures, and the track frame is designed to minimize mud accumulation. The heavy-duty bucket is made of wear-resistant steel with thickened side plates, ensuring long-term structural integrity under abrasive conditions.
The pressurized cab offers a wide field of view with enlarged glass panels to minimize blind spots. Controls are ergonomically arranged for fatigue-free operation. The cab is equipped with a high-performance HVAC system, premium seat, and multifunction LCD monitor, providing a comfortable and safe workspace.
The intelligent LCD monitor provides real-time data on engine speed, temperature, and oil pressure. Maintenance is simplified through ground-level access to the centralized filter group and large-capacity fuel tank, significantly reducing downtime and lowering total cost of ownership.
📊 Performance Parameters | |
| Bucket Capacity (m³) | 1.7 |
| Swing Speed (rpm) | 0-11 |
| Maximum Gradeability (°) | 35 |
| Maximum Bucket Digging Force (kN) | 244 |
| Maximum Arm Digging Force (kN) | 200 |
| Engine Model | SL 9 |
| Rated Power/Speed (kW/rpm) | 219/1900 |
| Tire Model | - |
| System Pressure (MPa) | 35 |
🏗️ Working Range | |
| Maximum Digging Height (mm) | 10511 |
| Maximum Dumping Height (mm) | 7572 |
| Maximum Digging Depth (mm) | 7372 |
| Maximum Vertical Digging Depth (mm) | 6731 |
| Maximum Digging Radius (mm) | 11178 |
| Minimum Swing Radius (mm) | 3865 |
📏 Overall Dimensions | |
| Overall Dimensions L*W*H (mm) | 11285*3190*3664 |
| Cab Height (mm) | 3168 |
| Wheelbase (mm) | 4099 |
| Wheel (Track) Gauge (mm) | 2590 |
| Minimum Ground Clearance (mm) | 536 |
| Tail Swing Radius (mm) | 3590 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.