
Large Excavator
The SH600 is a premier 55-60 ton-class giant, meticulously engineered for the harshest industrial environments such as open-pit mining, large quarries, and large earthmoving projects. By combining high-output engine technology with precision hydraulic control, it delivers an unparalleled combination of brute power and operating finesse.
The SH600 is driven by a high-performance Cummins QSM11-C400 engine, producing up to 298 kW of rated power. This engine is optimized for low-speed, high-torque delivery, ensuring stable and reliable output even under sustained maximum load, maintaining high performance in the most extreme geological conditions.
Equipped with a large-capacity 2.5–3.5 cubic meter bucket, the SH600 is designed to move large volumes of material in every cycle. This high throughput makes it the ultimate choice for mass excavation, high-intensity quarry loading, and mining production.
With a bucket digging force of 328 kN and an arm digging force of 271 kN, the SH600 offers industry-leading penetration capability. It easily cuts through hard soil, compacted clay, and fractured rock formations, ensuring maximum efficiency in site preparation and material extraction.
The advanced hydraulic system delivers a massive flow of 874 liters/minute, managed through precise negative flow control. This ensures lightning-fast response times, smooth multi-function synchronization, and significantly reduced cycle times while maintaining excellent fuel economy.
Weighing 55,900 kg, the SH600 provides a rock-solid foundation for heavy lifting. Its reinforced travel system features 349 kN of traction force and a 70% gradeability, enabling it to traverse steep slopes and rugged mining terrain with absolute stability and confidence.
| Specifications | Details |
|---|---|
⚙️ Engine System | |
| Model | Cummins QSM11-C400 |
| Engine Configuration | 6-cylinder in-line, turbocharged and intercooled |
| Cylinders × Bore × Stroke (mm) | 6 × 125 × 150 |
| Displacement (L) | 10.8 |
| Rated Power (kW/rpm) | 298/1800 |
⛏️ Bucket Performance | |
| Bucket Capacity (m³) | 2.5 – 3.5 |
| Bucket Width (mm) | 1968 |
💪 Digging Force | |
| Bucket Digging Force (kN) | 328 |
| Arm Digging Force (kN) | 271 |
💧 Hydraulic System | |
| Pump Control Type | Negative Flow Control |
| Maximum Operating Flow (L/min) | 874 |
| Travel Circuit Pressure (MPa) | 34.3 |
| Swing Circuit Pressure (MPa) | 28.4 |
| Pilot System Pressure (MPa) | 4.9 |
🛤️ Travel System | |
| Travel Speed (km/h) | 3.55 / 6.1 |
| Traction Force (kN) | 349 |
| Gradeability | 70% (35°) |
| Track Rollers (per side) | 9 |
| Carrier Rollers (per side) | 2 |
⚖️ Weight and Ground Pressure | |
| Operating Weight (kg) | 55900 |
| Ground Pressure (kPa) | 85.3 |
🔄 Swing System | |
| Swing Speed (rpm) | 10.4 |
| Brake Type | Spring-applied multi-disc brake |
🛢️ Fluid Capacities | |
| Fuel Tank Capacity (L) | 630 |
| Coolant Capacity (L) | 39 |
| Engine Oil Capacity (L) | 38 |
| Hydraulic Tank/System Capacity (L) | 490 / 610 |
📏 Overall Dimensions | |
| Overall Length (mm) | 10252 |
| Ground Contact Length During Transport (mm) | 4414 |
| Overall Height to Top of Cab (mm) | 3379 |
| Overall Width (mm) | 3718 / 4154 |
| Counterweight Ground Clearance (mm) | 1426 |
| Minimum Ground Clearance (mm) | 1382 |
| Tail Swing Radius (mm) | 3822 |
| Track Shoe Width (mm) | 600 |
🏗️ Working Range | |
| Maximum Digging Height (mm) | 10252 |
| Maximum Dumping Height (mm) | 7150 |
| Maximum Digging Depth (mm) | 7114 |
| Maximum Digging Radius (mm) | 11406 |
| Minimum Front Swing Radius (mm) | 4840 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.