
Large Loader
This wheel loader is equipped with a Weichai WP10H China IV engine and integrates multiple core technologies, balancing power, efficiency, durability, and comfort. It adapts to various working conditions and provides users with efficient and reliable operation solutions.
Equipped with a Weichai WP10H China IV engine and a reinforced cylinder block design, it further increases in-cylinder explosion pressure for more complete combustion, stronger power, and greater driving force. It is an electronically controlled high-pressure common rail engine with three-level power control modes: P, S, and E (heavy load, medium load, and light load). You can select reasonably according to working conditions to reduce energy consumption and help improve productivity.
The overall wheelbase is moderate, combining digging force and flexibility to achieve multiple uses in one machine, avoid equipment idling, and ensure high productivity. The bucket capacity range is 2.4–4.5 m³, and the maximum digging force is ≥170 kN, enabling efficient completion of various loading and digging tasks. The total cycle time of the three operations is ≤9.3 s, greatly improving work efficiency.
It adopts a dual-pump converging hydraulic system. After convergence, the flow is large, the rated working pressure is high, and the lifting speed is fast. The whole machine runs powerfully, responds quickly, and has good directional control, greatly improving work efficiency. Matched with a maximum traction force of 155 kN, it ensures stable operation under complex working conditions.

The gearbox adopts a magnetic suspension overrunning clutch, and the magnetic force is stable under high-temperature and fluid-flow environments. Strong magnetism enables the vulnerable parts inside the clutch to work in a non-contact manner, greatly extending the service life of the clutch. Equipped with reinforced front and rear frames, reasonable load distribution, large bearing capacity, and good stability; the reinforced bucket has low tooth insertion resistance, and a wear-resistant plate is installed at the bottom of the bucket, greatly improving strength and wear resistance.
It features an engine limp-home function and dual-potentiometer throttle pedal function, enabling fault protection and early diagnosis, and is safe and reliable. The engine electronic control unit and instrument panel use CAN data bus communication technology, providing high reliability. The integrated cylinder head design, integrated fuel coarse filter and fine filter design, and integrated oil filter design make the structure more compact and maintenance more convenient.
The driving space is comfortable, and the stepped instrument panel is brightly colored, eye-catching, highly recognizable, and easy to understand. The steel-structure cab has a large interior space and a wide field of view, and all control handles are within reach, convenient and comfortable. The dual-curved, unequal-pitch fan runs more quietly, effectively reducing overall machine noise.
Platform-based design: adopting the CAST design concept, components such as cylinders and front and rear frames use unified designs, with high parts commonality for easy storage and maintenance. The large-opening side cover assisted by gas springs and the openable rear engine hood provide large maintenance space, saving time and effort. The fuel filter and air filter are centrally arranged on the same side of the engine, making daily maintenance more convenient; the urea tank and urea pump are arranged on the right side of the counterweight (bucket direction), allowing the cover to be opened conveniently for urea filling and maintenance.
This wheel loader integrates powerful performance, high efficiency, durability, and comfort, with a total mass of 17,000 kg and a rated working mass of 5,000 kg. It is equipped with a Weichai WP10H China IV engine and a LINGONG planetary gearbox, reinforced drive axles, and is easy to operate, mature, and reliable. With an excellent power system, efficient hydraulic system, durable structure, and humanized design, it can efficiently complete loading, digging, transportation, and other tasks under various complex working conditions. It has advantages such as energy saving, high efficiency, long service life, and convenient maintenance, making it ideal equipment for construction engineering, mining, logistics, and other fields.
| 656G Wheel Loader | |
|---|---|
| Performance | |
| Rated load (kg) | 5000 |
| Total machine weight (kg) | 16700 |
| Rated bucket capacity (m³) | 3 |
| Maximum traction force (kN) | 172 |
| Maximum digging force (kN) | ≥162 |
| Maximum gradeability | 30° |
| Maximum dumping height (mm) | 3100 |
| Maximum dumping reach (mm) | 1260 |
| Overall dimensions (L×W×H) (mm) | 8247 × 3060 × 3410 |
| Minimum turning radius (mm) | 6000 |
| Engine | |
| Engine model | Weichai Steyr WD10G220E21 |
| Engine type | Tier 2, inline 6-cylinder, four-stroke |
| Cylinders - bore × stroke (mm) | 6 - 126 × 130 |
| Rated power (kW @ rpm) | 162 @ 2400 |
| Maximum torque (N·m) | 920 |
| Minimum fuel consumption rate (g/kW·h) | ≤215 |
| Transmission System | |
| Torque converter model | YJ375 |
| Transmission type | Power shift constant-mesh spur gear |
| Gears | 4 forward / 4 reverse |
| Maximum speed (km/h) | 38 |
| Drive Axle | |
| Main reduction type | Spiral bevel gear single-stage reduction |
| Wheel-end reduction type | Planetary reduction, 1 stage |
| Wheelbase (mm) | 3300 |
| Track width (mm) | 2250 |
| Minimum ground clearance (mm) | 450 |
| System working pressure (MPa) | 18 |
| Hydraulic System | |
| Boom lifting time (s) | 5.95 ± 0.2 |
| Total cycle time (s) | 10.95 ± 0.5 |
| Tank capacity (L) | 300 |
| Automatic leveling function | Yes |
| Brake System | |
| Service brake | Air-over-hydraulic disc brake (4 wheels) |
| Parking brake | Manual disc brake |
| Tires | |
| Tire specification | 23.5-25 |
| Front tire pressure (MPa) | 0.4 |
| Rear tire pressure (MPa) | 0.35 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.