
Large Loader
This loader is powered by a Weichai WP10H China IV engine and integrates multiple core technologies, balancing power, efficiency, durability, and comfort. It adapts to various working conditions and provides users with efficient and reliable operation solutions.
Equipped with a Weichai WP10H China IV engine, it adopts a reinforced cylinder block design to further increase in-cylinder explosion pressure, enabling more complete combustion, stronger power, and greater driving force. It is an electronically controlled high-pressure common rail engine with three-level power control modes: P, S, and E (heavy load, medium load, and light load). You can select reasonably according to working conditions to reduce energy consumption and help improve productivity.
The overall wheelbase is moderate, combining breakout force with flexibility to achieve multiple uses in one machine, avoid equipment idling, and ensure high productivity. The bucket capacity ranges from 2.4 to 4.5 m³, and the maximum breakout force is ≥170 kN, enabling efficient completion of various loading and digging tasks. The total time for the three operations is ≤9.3 s, greatly improving work efficiency.
It adopts a dual-pump converging hydraulic system. After convergence, the flow is large, the rated working pressure is high, and the lifting speed is fast. The whole machine runs powerfully, responds quickly, and has good directional control, greatly improving work efficiency. It matches a maximum traction force of 155 kN to ensure stable operation under complex working conditions.
The gearbox adopts a magnetic suspension overrunning clutch, and the magnetic force remains stable under high-temperature and fluid-flow environments. Strong magnetism enables the wearing parts inside the clutch to work in a non-contact manner, greatly extending the service life of the clutch. It is equipped with reinforced front and rear frames, with reasonable load distribution, large bearing capacity, and good stability; the reinforced bucket has low tooth penetration resistance, and the bucket bottom is equipped with wear-resistant plates, greatly improving strength and wear resistance.
It features an engine limp-home function and a dual-potentiometer throttle pedal function to achieve fault protection and early diagnosis, ensuring safety and reliability. The engine electronic control unit and instrument panel use CAN data bus communication technology for high reliability. The integrated cylinder head design, integrated design of the fuel pre-filter and fine filter, and integrated design of the oil filter make the structure more compact and maintenance more convenient.
The driving space is comfortable, and the stepped instrument panel is brightly colored, eye-catching, highly recognizable, and easy to understand. The steel-structure cab has a large interior space and a wide field of view, and all control handles are within easy reach, making operation convenient and comfortable. The double-curved, unequal-pitch fan runs more quietly, effectively reducing the overall noise of the machine.
Platform-based design: adopting the CAST design concept, components such as cylinders and front and rear frames use unified designs, with high parts commonality, facilitating storage and maintenance. The large-opening side cover assisted by a gas spring and the openable rear engine hood provide ample maintenance space, saving time and effort. The fuel filter and air filter are centrally arranged on the same side of the engine, making daily maintenance more convenient; the urea tank and urea pump are arranged on the right side of the counterweight (in the bucket direction), allowing the cover to be opened conveniently for urea filling and maintenance.
This loader integrates powerful performance, high efficiency, durability, and comfort. Its total mass is 17,000 kg, and its rated operating mass is 5,000 kg. It is powered by a Weichai WP10H China IV engine and a LINGONG planetary gearbox, with reinforced drive axles, offering convenient operation and mature reliability. With an excellent power system, efficient hydraulic system, durable structure, and humanized design, it can efficiently complete loading, digging, and transportation tasks under various complex working conditions. It offers advantages such as energy saving, high efficiency, long service life, and convenient maintenance, making it ideal equipment for fields such as construction engineering, mining, and logistics.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.