
Small Bulldozer
Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Medium Bulldozer
Tonnage: 13–23 t
Balanced power, broad application and good value.
Large Bulldozer
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Mini Excavator
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Small Excavator
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Medium Excavator
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Large Excavator
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Wheeled Excavator
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Small Loader
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Medium Loader
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Large Loader
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Skid Steer Loader
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Backhoe Loader
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Small Pipe Layer
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Medium Pipe Layer
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Large Pipe Layer
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Single Drum Vibratory Road Roller
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Double Drum Road Roller
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Pneumatic Tire Roller
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Mini Road Roller
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Landfill Compactor
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.

Expert support · Worldwide shipping








Large Loader
| Wheel Loader (Model: Weichai Steyr WD10G220E21) | |
|---|---|
| Basic Specifications | |
| Rated load (kg) | 5000 |
| Operating weight (kg) | 16700 |
| Rated bucket capacity (m³) | 3 |
| Maximum traction force (kN) | 172 |
| Maximum breakout force (kN) | ≥162 |
| Maximum gradeability | 30° |
| Maximum dump height (mm) | 3100 |
| Maximum dump reach (mm) | 1260 |
| Overall dimensions (L × W × H) (mm) | 8150 × 3024 × 3426 |
| Minimum turning radius (mm) | 6000 |
| Engine | |
| Engine model | Weichai Steyr WD10G220E21 |
| Engine type | Tier 2, inline 6-cylinder, four-stroke |
| Cylinder - bore × stroke (mm) | 6 - 126 × 130 |
| Rated power (kW @ rpm) | 162 @ 2400 |
| Maximum torque (N·m) | 920 |
| Minimum fuel consumption rate (g/kW·h) | ≤215 |
| Transmission System and Gearbox | |
| Torque converter model | YJSW315-8A |
| Transmission type | Planetary power shift |
| Gears | 2 forward / 1 reverse |
| Maximum speed (km/h) | 38 |
| Main reduction type | Single-stage spiral bevel gear reduction |
| Wheel reduction type | Single-stage planetary reduction |
| Wheelbase (mm) | 3300 |
| Track width (mm) | 2250 |
| Minimum ground clearance (mm) | 435 |
| Hydraulic System | |
| System working pressure (MPa) | 18 |
| Boom lifting time (s) | 5.95 ± 0.2 |
| Total cycle time (s) | 10.95 ± 0.5 |
| Tank capacity (L) | 300 |
| Automatic leveling function | Yes |
| Brake System | |
| Service brake | Air-over-hydraulic disc brake (4 wheels) |
| Parking brake | Manual disc brake |
| Tires | |
| Tire specification | 23.5-25 |
| Front tire pressure (MPa) | 0.4 |
| Rear tire pressure (MPa) | 0.35 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.