
Medium Bulldozer
The DH17-G 178HP is a new-generation full hydraulic bulldozer that meets China IV emission requirements for non-road machinery. It delivers stable 178HP power output, hydrostatic transmission, strong performance, high efficiency, reliable structure and low fuel consumption. The working equipment operates flexibly, the cab offers a wide field of view and high comfort, and the machine adapts to harsh working environments with convenient maintenance.
This 178HP bulldozer is designed for dozing, excavating and backfilling earth and rock on highways, railways, mines and airports. With strong 178HP power performance, it is essential machinery for national defense, mining development, road construction and water conservancy projects.

The Weichai WP7 China IV electronically controlled engine provides stable 178HP rated power output and meets the latest non-road emission standards. It runs intelligently and efficiently with low overall fuel consumption.
The machine is equipped with three power modes that can be selected according to the actual load, achieving an ideal match between 178HP power, work efficiency and energy saving.

The whole machine adopts a dual-circuit electric hydrostatic drive system with load-adaptive function. It supports stepless speed regulation load steering and fixed steering, working efficiently with 178HP power output in narrow working areas.
The transfer case design optimizes the hydraulic system layout, reducing fuel consumption by 10% while maintaining the high efficiency of 178HP.

The undercarriage system features a long ground contact length and a minimum ground clearance of 410mm, ensuring stable travel and strong passability with the support of 178HP power.
The fuel tank capacity reaches 352L, expanding the working range by 15% and supporting 178HP power output for continuous operation of more than 14 hours.
Six intelligent control functions are newly added, including slip ratio control, economy mode, driving response control, reverse start mode and automatic idle. All systems work together to optimize 178HP power output, efficiency and fuel consumption.
The 8-inch intelligent display terminal provides clear data, fault self-diagnosis and a friendly user interface for better operation of the 178HP bulldozer.
A rearview camera is standard to improve safety during operation of the 178HP bulldozer.

The six-sided integrated cab adopts an ergonomic design with 20% more space. It uses 4-point MDS shock absorption to reduce vibration and noise, creating a comfortable operating environment for the 178HP bulldozer.
The noise level near the operator's ear can be reduced to 78dB, and the sealed cab maintains 45Pa positive pressure to isolate dust and noise.
The rear-mounted air conditioning system is 15% more efficient, providing a comfortable operating environment for long working hours with 178HP power.

Travel and working equipment are controlled by a single joystick, making the 178HP bulldozer flexible, easy and comfortable to operate.
The suspended single-pedal structure synchronizes throttle and brake control, providing a compact layout, ample space and smooth operation for the 178HP machine.

The externally mounted working valve and track rollers make maintenance of the 178HP bulldozer more convenient.
The side-opening protective cover provides ample maintenance space, and the engine compartment light improves safety during nighttime inspection.
The vehicle wiring harness is well protected with high-quality components, ensuring stable and reliable performance of the 178HP bulldozer.
The modular structure simplifies disassembly, assembly and maintenance, reduces the failure rate and increases the use efficiency of the 178HP machine by more than 50%.
Application scope: general earthworks, construction sites, road building, mining and short-distance material transport.
Core advantages: stable 178HP power, standard undercarriage, flexible control, low fuel consumption, strong versatility and high cost-effectiveness.
| DH17-G XL (Standard Version) Bulldozer — Technical Parameters | |
|---|---|
| Performance parameters | |
| Operating mass (kg) | 17730 (with ripper) / 19290 (with drawbar) |
| Minimum turning radius (mm) | 3745 |
| Ground pressure (kPa) | 65 (with ripper) / 77 (with drawbar) |
| Engine | |
| Engine model | WP7 (China IV) |
| Rated power / rated speed (kW/rpm) | 152 / 1800 (178HP) |
| Overall dimensions | |
| Dimensions (mm) | 5465 × 3452 × 3154 |
| Walking performance | |
| Forward speed (km/h) | 0–10 |
| Reverse speed (km/h) | 0–10 |
| Ground clearance (mm) | 410 |
| Undercarriage system | |
| Track gauge (mm) | 1880 |
| Track shoe width (mm) | 510 (standard) / 560 / 610 |
| Ground contact length (mm) | 2675 |
| Number of track shoes (one side) | 39 |
| Track link pitch (mm) | 203 |
| Number of rollers (one side) | 2 |
| Number of support rollers (one side) | 7 |
| Fuel tank capacity | |
| Fuel tank (L) | 352 |
| Working hydraulic oil tank (L) | 85 |
| Working equipment | |
| Blade type | Straight tilt blade / semi-U blade |
| Blade width (mm) | 3452 / 3415 |
| Blade height (mm) | 1127 / 1200 |
| Blade lifting height (mm) | 510 |
| Digging depth (mm) | 520 |
| Ripper type | Three-tooth |
| Ripping depth (mm) | 475 |
| Ripper lifting height (mm) | 570 |
| Winch form | |
| Winch | — |
Application scope: swamps, wetlands, riverbanks, soft soil foundations, water conservancy projects and muddy working sites.
Core advantages: strong 178HP power, extra-wide tracks, ultra-low ground pressure, no sinking, high passability and stable performance on soft ground.
| DH17-G LGP (Super Wetland Version) Bulldozer — Technical Parameters | |
|---|---|
| Performance parameters | |
| Operating mass (kg) | 19690 |
| Minimum turning radius (mm) | 3895 |
| Ground pressure (kPa) | 30.5 |
| Engine | |
| Engine model | WP7 (China IV) |
| Rated power / rated speed | 152 / 1800 (178HP) |
| Overall dimensions | |
| Dimensions (mm) | 5500 × 4230 × 3191 |
| Walking performance | |
| Forward speed (km/h) | 0–10 |
| Reverse speed (km/h) | 0–10 |
| Ground clearance (mm) | 410 |
| Undercarriage system | |
| Track gauge (mm) | 2350 |
| Track shoe width (mm) | 1100 (standard) / 950 |
| Ground contact length (mm) | 2935 |
| Number of track shoes | 42 |
| Chain pitch (mm) | 203 |
| Idler (one side) | 2 |
| Support roller (one side) | 7 |
| Fuel tank capacity | |
| Fuel tank (L) | 352 |
| Working hydraulic oil tank (L) | 85 |
| Working equipment | |
| Blade type | Straight tilt blade |
| Blade width (mm) | 4230 |
| Blade height (mm) | 1040 |
| Blade lifting height (mm) | 1020 |
| Digging depth (mm) | 485 |
| Ripper type | — |
| Ripping depth (mm) | — |
| Ripper lifting height (mm) | — |
| Winch form | |
| Winch | — |
Application: coal yards, ports, power plants, bulk material storage and bulk material handling.
Core advantages: strong 178HP power, large-capacity coal blade, high wear resistance, high dozing efficiency and long service life.
| DH17-G CH (Coal Version) Bulldozer — Technical Parameters | |
|---|---|
| Performance parameters | |
| Operating mass (kg) | 18140 |
| Minimum turning radius (mm) | 4246 |
| Ground pressure (kPa) | 60.5 |
| Engine | |
| Engine model | WP7 (China IV) |
| Rated power / rated speed | 152 / 1800 (178HP) |
| Overall dimensions | |
| Dimensions (mm) | 5905 × 3905 × 3154 |
| Walking performance | |
| Forward speed | 0–10 |
| Reverse speed | 0–10 |
| Ground clearance | 410 |
| Undercarriage system | |
| Track gauge (mm) | 1880 |
| Track shoe width | 560 (standard) / 510 / 610 |
| Ground contact length | 2675 |
| Track shoe | 39 |
| Chain pitch | 203 |
| Idler | 2 |
| Support roller | 7 |
| Fuel tank capacity | |
| Fuel tank | 352 L |
| Hydraulic oil tank | 85 L |
| Working equipment | |
| Blade type | Coal pushing blade |
| Blade width | 3905 mm |
| Blade height | 1228 mm |
| Blade lifting height | 1010 mm |
| Digging depth | 520 mm |
| Ripper | — |
| Winch form | |
| Winch | — |
Application scope: landfills, municipal waste treatment stations, sanitation projects and material compaction.
Core advantages: strong 178HP power, large sanitation blade, sealed undercarriage, low ground pressure, anti-corrosion and high work efficiency.
| DH17-G WH (Sanitation Version) Bulldozer — Technical Parameters | |
|---|---|
| Performance parameters | |
| Operating mass (kg) | 20320 |
| Minimum turning radius (mm) | 3895 |
| Ground pressure (kPa) | 31.5 |
| Engine | |
| Engine | WP7 (China IV) |
| Rated power | 152 / 1800 (178HP) |
| Overall dimensions | |
| Dimensions | 5500 × 4230 × 3191 |
| Walking performance | |
| Forward speed | 0–10 |
| Reverse speed | 0–10 |
| Ground clearance | 410 |
| Undercarriage system | |
| Track gauge | 2350 mm |
| Track shoe width | 1100 (standard) / 950 |
| Ground contact length | 2935 mm |
| Track shoe | 42 |
| Chain pitch | 203 mm |
| Idler | 2 |
| Support roller | 7 |
| Fuel tank capacity | |
| Fuel tank | 352 L |
| Hydraulic oil tank | 85 L |
| Working equipment | |
| Blade type | Sanitation blade |
| Blade width | 4230 mm |
| Blade height | 1595 mm |
| Blade lifting height | 1020 mm |
| Digging depth | 485 mm |
| Ripper | — |
| Winch form | |
| Winch | — |
Application: forest logging, mountain roads, obstacle clearing, log handling and field environment rescue.
Core advantages: strong 178HP power, reinforced body, protective frame, winch support, high torque and strong off-road performance.
Application scope: desert areas, high-temperature and dusty environments, desert construction and sand control projects.
Core advantages: strong 178HP power, enhanced dust-proof system, efficient heat dissipation, wear-resistant undercarriage and stable performance in extreme environments.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.