
Medium Bulldozer
Equipped with a Weichai WP10 electronically controlled engine, with self-manufactured transmission and undercarriage systems, delivering high efficiency and long service life. Stable 178 high-horsepower output support, full box-type main frame, strong impact and torsion resistance, ensuring long-term stable operation. Standard straight blade with strong cutting force, paired with a three-shank ripper to easily break clay and frozen soil. This 178 HP medium bulldozer is widely used for earthmoving, excavation and backfilling in highways, railways, mines, airports and other projects.
Equipped with the WP10 electronically controlled engine, meeting the national non-road machinery China IV emission standard. This engine provides stable 178 HP power output and features high efficiency, energy saving and low daily maintenance costs.
Large torque reserve ratio and rated power of 131 kW ensure ample power reserve under heavy-load conditions.
The engine adopts a radial sealing intake system, effectively extending its overall service life.
The transmission system perfectly matches the engine power curve, providing a wider efficient working range and higher power transmission efficiency.
The transmission system independently produced by Shanbo has been verified by the market over the long term, with stable operating performance and reliable overall quality.
Hexagonal cab with spacious interior and wide field of view; FOPS/ROPS can be configured as needed to ensure safe and reliable construction.
Electronically controlled hand and foot throttles deliver a more precise and comfortable operating experience.
Equipped with an intelligent display control terminal and an integrated heating and cooling air conditioning system, the driver can easily view real-time equipment status and enjoy a comfortable ride in all seasons.
The stable and reliable Shanbo independent undercarriage system can adapt to various harsh outdoor working conditions.
The product features a longer ground contact length and higher ground clearance, bringing stable travel status and excellent site passability.
Depending on different working conditions, it can be equipped with a straight blade, U-blade, angle blade, coal blade, rock blade, sanitation blade, ripper, drawbar and more, enriching construction functions. Standard LED work lights greatly improve nighttime construction visibility and operating safety.
All structural parts inherit the excellent quality of Shanbo's mature products.
The wiring harness is protected by corrugated tubing with partition lines, achieving a high level of dustproof and waterproof protection.
Large openable side covers greatly simplify daily inspection and equipment repair work.
The fuel filter and air filter are designed on the same side, enabling convenient one-stop maintenance operations.
Exposed lubrication points on core components such as the fan shaft and equalizer beam make daily lubrication maintenance more time-saving and labor-saving.
| SD16 Standard Version Bulldozer | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 17000 |
| Minimum turning radius (mm) | 4466 |
| Ground pressure (kPa) | 58 |
| Engine | |
| Engine model | WP10 |
| Rated power/speed (kW/rpm) | 131 / 1850 |
| Overall Dimensions | |
| Machine dimensions (mm) | 5140 × 3455 × 3024 |
| Travel Performance | |
| Forward speed (km/h) | F1: 0–3.29 / F2: 0–5.82 / F3: 0–9.63 |
| Reverse speed (km/h) | R1: 0–4.28 / R2: 0–7.59 / R3: 0–12.53 |
| Ground clearance (mm) | 400 |
| Undercarriage System | |
| Track center (mm) | 1880 |
| Track shoe width (mm) | 510 |
| Ground contact length (mm) | 2635 |
| Number of track shoes (one side) | 37 |
| Fuel System | |
| Track link pitch (mm) | 203 |
| Number of rollers (one side) | 2 upper / 6 lower |
| Fuel tank capacity (L) | 315 |
| Working hydraulic oil tank (L) | 112 |
| Blade Parameters | |
| Blade type | Angle blade/straight blade/U-blade |
| Blade width (mm) | 4011 / 3455 / 3556 |
| Blade height (mm) | 1040 / 1149 / 1120 |
| Blade lift height (mm) | 1005 |
| Blade digging depth (mm) | 540 |
| Ripper type | Three-shank ripper |
| Ripper lift height (mm) | 570 |
| Vehicle Type | |
| Retained vehicle type | — |
This 178 high-horsepower coal-specific bulldozer is specially developed for the special operational needs of power plants and port stockyards. Equipped with standard wide tracks and an extra-large-capacity coal blade. Using high-strength box structure and high-wear-resistant materials, it achieves extremely high coal pushing efficiency and long service life. It is mainly suitable for loading, unloading and construction operations of bulk materials in power plants, ports and other sites.
| SD16C Coal Version Bulldozer | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 17500 |
| Minimum turning radius (mm) | 4466 |
| Ground pressure (kPa) | 55 |
| Engine | |
| Engine model | WP10 |
| Rated power/speed (kW/rpm) | 131 / 1850 |
| Overall Dimensions | |
| Machine dimensions (mm) | 5427 × 3900 × 3032 |
| Travel Performance | |
| Forward speed (km/h) | Same as SD16 |
| Reverse speed (km/h) | Same as SD16 |
| Ground clearance (mm) | 400 |
| Undercarriage System | |
| Track center (mm) | 1880 |
| Track shoe width (mm) | 510 |
| Ground contact length (mm) | 2635 |
| Number of track shoes (one side) | 37 |
| Fuel System | |
| Track link pitch (mm) | 203 |
| Number of rollers (one side) | 2 upper / 6 lower |
| Fuel tank capacity (L) | 315 |
| Working hydraulic oil tank (L) | 112 |
| Blade Parameters | |
| Blade type | Coal blade |
| Blade width (mm) | 4150 |
| Blade height (mm) | 960 |
| Blade lift height (mm) | 1095 |
| Blade digging depth (mm) | 540 |
| Vehicle Type | |
| Retained vehicle type | — |
The 178 HP extended version bulldozer optimizes the body structure and speed configuration on the basis of the standard model, maintains stable and strong power output, and improves overall operational flexibility and work efficiency. It is suitable for medium-distance continuous earthmoving and leveling construction on general engineering sites.
| SD16B Extended Version Bulldozer | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 17100 |
| Minimum turning radius (mm) | 4466 |
| Ground pressure (kPa) | — |
| Engine | |
| Engine model | WP10 |
| Rated power/speed (kW/rpm) | 131 / 1850 |
| Overall Dimensions | |
| Machine dimensions (mm) | 5241 × 3455 × 3025 |
| Travel Performance | |
| Forward speed (km/h) | F1: 0–3.29 / F2: 0–5.82 / F3: 0–9.82 |
| Reverse speed (km/h) | R1: 0–4.28 / R2: 0–7.59 / R3: 0–12.53 |
| Ground clearance (mm) | 400 |
| Undercarriage System | |
| Track center (mm) | 1880 |
| Track shoe width (mm) | 510 |
| Ground contact length (mm) | 2635 |
| Number of track shoes (one side) | — |
| Fuel System | |
| Track link pitch (mm) | — |
| Number of rollers (one side) | 2 upper / 6 lower |
| Fuel tank capacity (L) | 315 |
| Working hydraulic oil tank (L) | 112 |
| Blade Parameters | |
| Blade type | Angle blade/straight blade/U-blade |
| Blade width (mm) | 4011 / 3455 / 3556 |
| Blade height (mm) | 1040 / 1149 / 1120 |
| Blade lift height (mm) | 1005 |
| Blade digging depth (mm) | 540 |
| Ripper type | Three-shank ripper |
| Ripper lift height (mm) | 570 |
| Vehicle Type | |
| Retained vehicle type | — |
This 178 HP super wetland-specific bulldozer is professionally developed for swamps and soft wetland working conditions. It adopts an ultra-low ground pressure undercarriage system and unique boat-shaped ribbed wide track shoes. Paired with a reliable WP10 engine and independently developed transmission assembly, it maintains stable 178HP power output, with high work efficiency and long service life. It is very suitable for soft soil swamp construction, wetland improvement and river channel improvement projects.
| SD16L Super Wetland Version Bulldozer | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 16900 |
| Minimum turning radius (mm) | 4466 |
| Ground pressure (kPa) | 22 |
| Engine | |
| Engine model | WP10 |
| Rated power/speed (kW/rpm) | 131 / 1850 |
| Overall Dimensions | |
| Machine dimensions (mm) | 5262 × 4150 × 3074 |
| Travel Performance | |
| Forward speed (km/h) | F1: 0–3.29 / F2: 0–5.82 / F3: 0–9.82 |
| Reverse speed (km/h) | R1: 0–4.28 / R2: 0–7.59 / R3: 0–12.53 |
| Ground clearance (mm) | 400 |
| Undercarriage System | |
| Track center (mm) | 1880 |
| Track shoe width (mm) | 960 |
| Ground contact length (mm) | 2635 |
| Number of track shoes (one side) | 41 |
| Fuel System | |
| Track link pitch (mm) | — |
| Number of rollers (one side) | 2 upper / 6 lower |
| Fuel tank capacity (L) | 315 |
| Working hydraulic oil tank (L) | 112 |
| Blade Parameters | |
| Blade type | Straight blade |
| Blade width (mm) | 4150 |
| Blade height (mm) | 1245 |
| Blade lift height (mm) | 985 |
| Blade digging depth (mm) | 482 |
| Vehicle Type | |
| Retained vehicle type | — |
This 178 HP sanitation bulldozer is developed for the operational needs of municipal solid waste treatment plants. It adopts a low ground pressure undercarriage and special boat-shaped track shoes, and is equipped with a large-size sanitation blade and mud scraping device. It uses a WP10 electronically controlled engine, with stable power output and strong construction capability. It is mainly used for landfill, site leveling, material piling and towing work at waste treatment stations.
| SD16R Sanitation Version Bulldozer | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 19000 |
| Minimum turning radius (mm) | — |
| Ground pressure (kPa) | 47 |
| Engine | |
| Engine model | WP10 |
| Rated power/speed (kW/rpm) | 131 / 1850 |
| Overall Dimensions | |
| Machine dimensions (mm) | 5140 × 3800 × 3320 |
| Travel Performance | |
| Forward speed (km/h) | F1: 0–3.29 / F2: 0–5.82 / F3: 0–9.82 |
| Reverse speed (km/h) | R1: 0–4.28 / R2: 0–7.59 / R3: 0–12.53 |
| Ground clearance (mm) | 400 |
| Undercarriage System | |
| Track center (mm) | 1880 |
| Track shoe width (mm) | 510 |
| Ground contact length (mm) | 2635 |
| Number of track shoes (one side) | — |
| Fuel System | |
| Track link pitch (mm) | 203 |
| Number of rollers (one side) | 2 upper / 6 lower |
| Fuel tank capacity (L) | 315 |
| Working hydraulic oil tank (L) | 112 |
| Blade Parameters | |
| Blade type | Sanitation blade |
| Blade width (mm) | 3800 |
| Blade height (mm) | 1040 |
| Blade lift height (mm) | 1005 |
| Blade digging depth (mm) | 490 |
| Vehicle Type | |
| Retained vehicle type | — |
This 178HP desert-specific bulldozer is customized for the harsh desert environment of high temperatures and blowing dust. Equipped with an efficient pre-filter device and optimized exhaust system, it enhances dust prevention capability and protects engine components. The upgraded cooling system, strengthened and durable undercarriage and special desert tracks greatly extend service life. Equipped with a comfortable enclosed cab with sunshade and efficient air conditioning, it brings an excellent driving experience and is very suitable for long-term operation in desert and arid high-temperature areas.
| SD16D Desert Version Bulldozer | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 17500 |
| Minimum turning radius (mm) | 4466 |
| Ground pressure (kPa) | — |
| Engine | |
| Engine model | WP10 |
| Rated power/speed (kW/rpm) | 131 / 1850 |
| Overall Dimensions | |
| Machine dimensions (mm) | 5427 × 3900 × 3032 |
| Travel Performance | |
| Forward speed (km/h) | F1: 0–3.29 / F2: 0–5.82 / F3: 0–9.82 |
| Reverse speed (km/h) | R1: 0–4.28 / R2: 0–7.59 / R3: 0–12.53 |
| Ground clearance (mm) | 400 |
| Undercarriage System | |
| Track center (mm) | 1880 |
| Track shoe width (mm) | 510 |
| Ground contact length (mm) | 2635 |
| Number of track shoes (one side) | 37 |
| Fuel System | |
| Track link pitch (mm) | 203 |
| Number of rollers (one side) | 2 upper / 6 lower |
| Fuel tank capacity (L) | 315 |
| Working hydraulic oil tank (L) | 112 |
| Blade Parameters | |
| Blade type | Desert blade |
| Blade width (mm) | 4000 |
| Blade height (mm) | 960 |
| Blade lift height (mm) | 1095 |
| Blade digging depth (mm) | 540 |
| Vehicle Type | |
| Retained vehicle type | — |
This 178HP forestry logging bulldozer is specially developed for forestry working environments, adopting hydraulic transmission and pilot control technology. The front-mounted rollover protection structure effectively protects the whole machine, with advanced and reasonable structure, stable performance and flexible operation. It is suitable for construction operations at forest logging sites and can also be used for winch towing self-rescue on dangerous road sections.
The standard logging blade can powerfully clear various obstacles on logging roads, helping the bulldozer efficiently complete logging operations. The winch is used for pulling logs and bulldozer self-rescue in forest operations, ensuring high work efficiency. The winch's self-rescue function provides safety protection for operators.
This 178HP super wetland bulldozer is developed according to swamp and wetland working conditions, adopting ultra-wide triangular track shoes to avoid sinking on soft soil, wetland and swamp ground. The blade's large length-to-diameter ratio can better remove soft soil, making it suitable for construction in swamps and other soft soil areas and improving work efficiency. It is an indispensable construction machine for water conservancy construction under soft soil foundation conditions.
This 178 HP extended track bulldozer is equipped with an extended undercarriage, with advanced and reasonable structure, flexible operating devices and convenient maintenance. It can adapt to harsher working environments and can work under low ground pressure conditions. It is suitable for pushing, excavating and backfilling earth and rock in highways, railways, mines, airports and other sites, and is an indispensable mechanical equipment for national defense projects, mine construction, urban and rural road construction and water conservancy construction.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.