
Medium Bulldozer
🚜 The SD26 series 260HP medium bulldozer adopts Shanbo's patented technologies, including central lubrication, central pressure testing, and automatic track tensioning, and has won the only National Gold Quality Award in China's bulldozer industry. The 260HP heavy-duty bulldozer is equipped with diverse work implements and a comfortable cab, fully meeting various complex construction needs and making it an ideal, efficient machine for earthmoving and bulk material handling.
📍 Applications: general engineering construction, road construction, site leveling, mining earthwork, and medium-duty heavy-load projects
✅ Core advantages: stable 260HP power output, mature patented core technologies, high transmission efficiency, robust integral structure, and ergonomic operation design
⚙️ The 260HP Weichai WP12G280E304 engine delivers strong power performance, high work efficiency, and outstanding energy savings.
⚙️ The highly reliable power-shift transmission, stable torque converter, and two-stage straight-tooth final drive ensure high power transmission efficiency and fully unleash the 260HP performance.
⚙️ The matched 260HP power unit maintains stable operation under full load and high-temperature working conditions without overheating failures.

⚙️ Supports automatic fault diagnosis and full-process operation monitoring. The one-piece injection-molded instrument panel integrates air conditioning, electrical controls, and display instruments, offering an attractive appearance and premium configuration.
⚙️ The integral box-type main frame uses high-strength materials and heavy-duty castings, providing strong impact and bending resistance. Precision welding ensures a long service life and perfectly matches the 260HP high-power output.
⚙️ The semi-rigid suspension undercarriage expands the track ground contact area and effectively improves the traction of this 260HP bulldozer.
⚙️ The ergonomic adjustable driver's seat and armrests allow free vertical and horizontal adjustment. Gear shifting, steering, and throttle controls are centrally arranged on the left, while the work implement is servo-controlled on the right, making operation light and flexible and effectively reducing fatigue during long hours of 260HP high-load work.
⚙️ The standard straight-tilt blade provides strong cutting force for harsh working conditions. The adjustable-penetration-angle multi-shank ripper can break clay, frozen soil, and hard gravel strata, maximizing the use of the 260HP strong power.

| SD26 260HP Bulldozer Technical Specifications | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 23450 |
| Maximum theoretical traction (kN) | 460 |
| Ground pressure (kPa) | 66 |
| Engine (260HP power core) | |
| Engine model | Weichai WP12G280E304 |
| Emission | China-III |
| Rated speed (rpm) | 1900 |
| Gross power (kW/HP) | 206 kW (277 HP) |
| Net power (kW/HP) | 194 kW (260 HP) |
| Bore × stroke (mm) | 126 × 155 |
| Displacement (L) | 11.596 |
| Maximum torque (N·m/rpm) | 1250 N·m @ 1200–1300 rpm |
| Cooling system | Mechanical fan |
| Dimensions | |
| Length (without ROPS) | — |
| Ground clearance (mm) | 405 |
| Machine length (without drawbar) | 5462 |
| Machine length (with drawbar) | 5459 |
| Maximum lift height (blade, mm) | 1210 |
| Maximum digging depth (blade, mm) | 540 |
| Blade width (mm) | 3725 |
| Blade height (mm) | 1315 |
| Track shoe width (mm) | 560 / 610 / 660 |
| Track shoe to track shoe width (mm) | 2560 |
| Travel Performance | |
| Forward speed (km/h) | F1: 3.8 / F2: 6.9 / F3: 11.8 |
| Reverse speed (km/h) | R1: 3.8 / R2: 6.9 / R3: 11.8 |
| Undercarriage System | |
| Track gauge (mm) | 2000 |
| Ground contact length (mm) | 2872 |
| Ground contact area (cm²) | 28727 |
| Track shoes (pieces/side) | 38 |
| Carrier rollers | 2 |
| Track rollers | 6 |
| Pitch (mm) | 206 |
| Tank Capacities | |
| Fuel tank (L) | 450 |
| Engine oil (L) | 24 |
| Hydraulic tank (L) | 110 |
| Transmission (L) | 112 |
| Final drive (L) | 82 (per side) |
| Work Equipment | |
| Blade type | SD: straight tilt |
| Blade capacity | 4.6 m³ |
| Ripper | |
| Type | Three-shank |
| Weight (kg) | 2600 |
| Maximum ripping depth (mm) | 666 |
| Maximum lift height (mm) | 555 |
| Ripper width (mm) | 2000 |
| Tooth spacing (mm) | 930 |
🔋 The 260HP-class Weichai WP12G280E304 engine offers excellent power performance, high work efficiency, and remarkable energy savings.

The high-efficiency turbocharger effectively optimizes the engine operating range, significantly reduces fuel consumption, and always maintains stable 260HP power output.
The advanced circulating lubrication system keeps internal engine components running at constant oil temperature and stable flow, reducing internal friction losses and extending the service life of the 260HP powertrain.
The high-strength cylinder block and optimized cylinder head structure enhance overall engine reliability, achieve full fuel combustion and low emissions, and maintain stable power output across a wide speed and load range.
🛞 The semi-rigid suspension undercarriage keeps the track rollers tightly fitted to the tracks, increasing the actual ground contact area and greatly improving the overall traction of this 260HP bulldozer.
The reinforced heavy-duty track assembly is custom-built for harsh working conditions, with high load capacity and strong impact resistance to adapt to various complex terrains.
❄️ The professionally matched cooling system ensures the 260HP engine works stably under full load and high-temperature environments, effectively avoiding overheating failures and ensuring continuous heavy-load operation.
💡 The intelligent electronic control system supports automatic fault detection and full-process operation monitoring. The integrated injection-molded control panel combines air conditioning, electrical components, and display instruments, with a beautiful appearance and high-end configuration.
🪟 The spacious enclosed cab offers a wide field of view and excellent shock absorption, greatly improving driving comfort during long hours of 260HP high-intensity work.
Designed according to ergonomics, the driver's seat and auxiliary armrests allow multi-directional free adjustment. The left-side centralized control mechanism uses flexible cable control, while the right-side work implement uses a labor-saving servo control system, making operation simple and effectively reducing driving fatigue.

🏗️ The integral box-type main frame is made of high-strength steel and heavy-duty castings, with strong torsion and impact resistance. Precision welding technology ensures overall durability and long-term stable support for the 260HP strong power.
🪓 The standard high-strength straight-tilt blade offers strong cutting capability and uses highly wear-resistant materials to adapt to various harsh construction environments. The 4.6m³ large-capacity blade, driven by 260HP power, significantly improves earthmoving efficiency. Optional angle blades, U-blades, and semi-U blades are available to meet diverse construction needs.
🔨 Specially designed for loosening frozen soil and clay and stripping hard gravel strata. It uses a thickened reinforced beam and hardened teeth tips, and with ample 260HP power, ensures super penetration capability and high breaking efficiency.

🛡️ Equipped with safety warning lights, a reverse buzzer, a reliable braking system, and standard safety paint, improving all-weather construction safety. The internal seat belt and anti-slip handrails provide comprehensive protection for the operator.
The external side guards effectively prevent the engine and radiator from being blocked and damaged by debris, well protecting the core 260HP power components.
Standard high-efficiency antifreeze improves cooling efficiency, prevents scale buildup inside the engine and radiator, and provides stable protection for the long-term operation of the 260HP power unit.
An optional rollover protection structure is available to provide effective safety assurance under sudden harsh working conditions.
🔧 Clear maintenance reminder markings make routine inspections regular and convenient. The maintenance-free battery reduces later maintenance difficulty. The wide-opening engine hood fully exposes internal core components, facilitating inspections, oil changes, and routine maintenance.
Overall reliability is high, significantly extending trouble-free operating cycles and effectively controlling the later use and maintenance costs of the 260HP bulldozer.
The comprehensive global after-sales service system provides timely and thoughtful technical support and spare parts supply, fully eliminating users' worries when purchasing the Shanbo 260HP series bulldozer.

🌲 The SD26F 260HP forestry bulldozer is professionally customized for forestry operations, with mature core technology, stable quality, low fuel consumption, and convenient daily maintenance, and features a dedicated built-in logging rollover protection cab.
📍 Applications: rainforest logging, agriculture and forestry development, log collection and skidding, forest road reconstruction, and other special forestry operations
✅ Core advantages: ample 260HP power reserve, logging-grade rollover protection safety cab, wide anti-sinking tracks, optional auxiliary winch, and strong off-road and self-rescue capability
The dedicated logging rollover protection cab and rainproof sunshade structure, together with 610mm widened tracks and an optional mechanical winch, provide excellent passability and field self-rescue performance, making it an ideal choice for log transport operations in forest farms and tropical rainforests.
| SD26F 260HP — Technical Specifications | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 24700 |
| Ground pressure (kPa) | 64 |
| Engine | |
| Engine model | Weichai WP12G280E304 (260HP) |
| Rated power | 206 kW @ 1900 rpm |
| Dimensions | |
| Machine height (mm) | 3402 |
| Track shoe width (mm) | 610 / 660 |
| Track shoe to track shoe width | 2610 mm |
| Travel Performance | |
| Forward speed | F1: 3.9 / F2: 7.1 / F3: 11.8 |
| Reverse speed | R1: 3.9 / R2: 7.1 / R3: 11.8 |
| Undercarriage | |
| Track gauge | 2000 |
| Ground contact length (mm) | 3473 |
| Ground contact area (cm²) | 34732 |
| Track shoes | 39 |
| Track rollers | 7 |
| Fuel system | |
| Fuel tank (L) | 450 |
| Blade | |
| Blade type | Straight tilt / angle / semi-U / U |
| Blade capacity | 4.6 / 3.4 / 6.4 / 7.5 m³ |
| Ripper | |
| Type | Three-shank |

📍 Applications: civil engineering earthwork, road foundation construction, leveling development, and general heavy-load operations across multiple terrains
✅ Core advantages: standard 260HP power configuration, reasonable overall weight distribution, low ground pressure design, stable travel status, and wide application range
| SD26E 260HP — Technical Specifications | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 24600 |
| Ground pressure (kPa) | 35.2 |
| Engine | |
| Engine model | Weichai WP12G280E304 (260HP) |
| Rated speed | 1900 rpm |
| Dimensions | |
| Machine length (mm) | 5712 |
| Machine length with drawbar (mm) | 5745 |
| Blade width (mm) | 3800 |
| Blade height (mm) | 1374 |
| Travel Performance | |
| Forward speed | F1: 3.9 / F2: 7.1 / F3: 11.8 |
| Undercarriage | |
| Track shoe width (mm) | 560 / 610 / 660 |
| Track gauge (mm) | 2000 |
| Fuel | |
| Fuel tank (L) | 450 |
| Blade | |
| Type | Straight tilt blade |
| Capacity | 5.2 m³ |

💦 The SD26S 260HP wetland bulldozer is specially developed for soft and muddy wetland conditions, with mature and stable performance, low fuel consumption, and convenient maintenance.
📍 Applications: wetland restoration, river dredging, tidal flat development, swamp foundation treatment, and earthwork construction on muddy roads
✅ Core advantages: stable 260HP power output, extended undercarriage structure with 910mm ultra-wide wetland tracks, ultra-low ground pressure, and excellent anti-sinking and soft-ground passability
The extended track frame and 910mm extra-wide wetland tracks greatly reduce the overall ground pressure, provide excellent soft-terrain passability, and maintain stable 260HP power output in muddy swamp areas.
| SD26S 260HP — Technical Specifications | |
|---|---|
| Performance Parameters | |
| Operating weight (kg) | 25700 |
| Ground pressure (kPa) | 32 |
| Engine | |
| Engine | Weichai WP12G280E304 (260HP) |
| Dimensions | |
| Machine length | 6257 mm |
| Machine length with drawbar | 6290 mm |
| Blade width | 4365 mm |
| Blade height | 1248 mm |
| Track shoe width | 910 mm (wetland) |
| Track gauge | 2000 mm |
| Total track shoe width | 3160 mm |
| Travel | |
| Forward speed | 3.1 / 5.8 / 10.9 |
| Undercarriage | |
| Ground contact length | 3480 mm |
| Track shoes | 45 |
| Blade | |
| Type | Straight tilt |
| Capacity | 5.2 m³ |
| Ripper | |
| Type | Single shank |
| Maximum ripping depth | 695 mm |
| Lift height | 515 mm |

🏜️ The SD26D 260HP desert bulldozer is customized for high-temperature and windy desert working environments, with stable operating performance, energy savings, and convenient maintenance.
📍 Applications: desert land reclamation, desert road construction, sand leveling, and infrastructure construction in arid regions of northwest China
✅ Core advantages: 260HP high-temperature-resistant power unit, extended anti-sinking undercarriage, large-capacity cooling system, and front-end air intake filtration, adapting to harsh high-temperature and dusty desert environments
The optimized undercarriage structure effectively reduces ground pressure and improves passability on desert sand. It is equipped with an enhanced large-capacity radiator and an engine front-mounted air filter, effectively adapting to the high-temperature and windy climate of desert and semi-desert areas and ensuring stable operation of the 260HP power system.

♻️ The SD26R 260HP sanitation-specific bulldozer adopts a mature wetland-specific undercarriage structure, effectively reducing ground pressure and improving site passability.
📍 Applications: municipal domestic waste landfill, landfill compaction, environmental landfill, and landfill site management
✅ Core advantages: inherits strong 260HP power performance, low-ground-pressure wetland undercarriage, complete safety auxiliary configuration, large-capacity waste pushing device, and high landfill compaction efficiency
Equipped with special sanitation configurations such as high-mounted warning lights, reverse monitoring alarms, and LED lighting to improve landfill construction safety. The large-capacity waste blade and dedicated compaction scraper, driven by 260HP power, greatly improve work efficiency.
🪨 The SD26W 260HP rock bulldozer is designed for hard rock strata and harsh mining conditions, with reliable quality, low fuel consumption, and convenient daily maintenance.
📍 Applications: mining and quarry extraction, hard rock strata stripping, mountain excavation, and heavy-load crushing operations in quarries
✅ Core advantages: ample 260HP breaking force, reinforced heavy-duty rock pushing blade, thickened wear-resistant undercarriage parts, strong impact resistance, and long service life
The entire machine is equipped with a customized high-strength rock-resistant work implement, and all wear parts use thickened wear-resistant processes, capable of withstanding long-term high-impact and heavy-load operations in mining and quarry sites.

💧 The SD26S 260HP wetland bulldozer is designed for various soft-soil wetland conditions, with a mature optimized design, advanced manufacturing process, high operating stability, and low later maintenance costs.
📍 Applications: swamp development, lowland improvement, mudflat engineering, and soft-foundation earthwork construction
✅ Core advantages: extended load-bearing structure plus 910mm ultra-wide wetland tracks achieve an ultra-low ground pressure design, and with stable 260HP power output, effectively avoid sinking in soft mud terrain
The extended track frame and 910mm large-size wetland track shoes significantly reduce the overall ground pressure, provide super soft-terrain passability, and stable 260HP power ensures continuous and efficient wetland construction operations.

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.