
Medium Bulldozer
Available versions: Standard, Rock, Desert, Sanitation, and Coal
The SD32 series bulldozer is a newly upgraded engineering machine optimized for market demand. Its technology leads domestically, and its overall reliability is outstanding. Its mature chassis structure has been verified in the global market for nearly 30 years, with stable performance and durable quality. It is widely used in water conservancy projects, mining, road construction, port operations, petroleum and coal industries, forest logging, national defense projects, and urban infrastructure construction, and is essential heavy equipment for various earthworks and civil engineering projects.


Equipped with a reliable WP12/QSNT-C345 electronically controlled engine, fully compliant with China III off-road emission standards. It delivers strong power output, high work efficiency, excellent energy-saving performance, and low daily maintenance costs.
Large torque reserve ensures stable operation under heavy loads, with rated power up to 257kW. The radially sealed intake structure effectively extends engine service life and reduces failure rates.
Perfectly matched power transmission assembly that fits the engine power curve, achieving a wider efficient working range and higher power transmission efficiency.
The transmission assembly independently developed by Shanbo has undergone long-term field testing, operates stably, and has trustworthy overall quality.
Features a six-sided enclosed cab with spacious interior and wide field of view. Optional FOPS&ROPS safety protection structure is available for safer operation.
Electronic hand-foot integrated throttle control enables more precise and effortless operation. Built-in intelligent digital display control panel enables real-time monitoring of machine data.

Mature high-strength chassis system adapts to various harsh construction environments. Long track ground contact length and high ground clearance ensure smooth travel and excellent off-road passability.
Flexible working equipment configuration: optional straight blade, semi-U blade, U blade, angle blade, coal blade, rock blade, sanitation blade, ripper, drawbar, etc. Standard high-brightness LED work lights support continuous day and night construction.
Key structural parts inherit mature high-quality design, with stable performance and long service life.
Internal wiring harnesses are all protected by corrugated tubes and arranged in tiers, achieving a high level of dust and water resistance.
Large open side guards reserve sufficient operating space for convenient inspection and repair. All lubrication and maintenance points are centrally arranged externally, greatly simplifying daily maintenance work and saving maintenance time.
| SD32 Standard Version Bulldozer Technical Parameters | |
|---|---|
| 📊 Basic Performance Parameters | |
| Operating weight (kg) | 40200 (with single-shank ripper and ROPS) |
| Minimum turning radius (mm) | 3800 |
| Ground pressure (kPa) | 97.7 |
| 🔥 Engine Configuration | |
| Engine model | WP12 / QSNT-C345 |
| Rated power/speed (kW/rpm) | 258/2000, 257/2000 |
| 📏 Overall Dimensions | |
| Overall dimensions (mm) | 8650 × 4130 × 3760 |
| 🏃 Travel Performance | |
| Forward speed (km/h) | F1: 0–3.6 / F2: 0–6.6 / F3: 0–11.5 |
| Reverse speed (km/h) | R1: 0–4.4 / R2: 0–7.8 / R3: 0–13.5 |
| Ground clearance (mm) | 500 |
| 🛞 Chassis System | |
| Track gauge (mm) | 2140 |
| Track shoe width (mm) | 560/610/660/710 |
| Track ground contact length (mm) | 3150 |
| Number of track shoes (each side) | 41 |
| 🔧 Chassis Specifications | |
| Track pitch (mm) | 228.6 |
| Track rollers (each side) | 2 |
| Carrier rollers (each side) | 7 |
| ⛽ Fuel Tank Capacity | |
| Fuel tank capacity (L) | 640 |
| Hydraulic oil tank (L) | 97 |
| Working Equipment Parameters | |
| Blade type | Straight/Angle/Semi-U |
| Blade width (mm) | 4130 / 5000 / 4130 |
| Blade height (mm) | 1590 / 1140 / 1710 |
| Maximum blade lift height (mm) | 1560 / 1703 / 1560 |
| Maximum digging depth (mm) | 560 / 630 / 560 |
| Ripper type | Single-shank/Three-shank |
| Maximum ripping depth (mm) | Single-shank: 1250 / Three-shank: 842 |
| Ripper lift height (mm) | Single-shank: 955 / Three-shank: 883 |
| Towing device | Optional |
The SD32C coal-specific bulldozer is tailored for power plants, ports, and bulk material stockyard operation scenarios. It comes standard with 610mm wide wear-resistant tracks, an extra-large capacity coal blade, and a high-strength box-type body structure made of high-toughness materials. It achieves efficient bulk material stacking, pushing, and leveling operations, making it ideal for bulk material transfer and stockyard organization in coal yards.
| SD32C Coal Version Bulldozer Parameters | |
|---|---|
| 📊 Basic Performance | |
| Operating weight (kg) | 40500 (with single-shank ripper and ROPS) |
| Minimum turning radius (mm) | 3800 |
| Ground pressure (kPa) | 98.4 |
| 🔥 Engine | |
| Engine model | QSNT-C345 |
| Rated power/speed (kW/rpm) | 257/2000 |
| 📏 Overall Dimensions | |
| Overall dimensions (mm) | 8650 × 4755 × 3760 |
| 🏃 Travel Performance | |
| Forward speed (km/h) | F1: 0–3.6 / F2: 0–6.6 / F3: 0–11.5 |
| Reverse speed (km/h) | R1: 0–4.4 / R2: 0–7.8 / R3: 0–13.5 |
| Ground clearance (mm) | 500 |
| 🛞 Chassis System | |
| Track gauge (mm) | 2140 |
| Track shoe width (mm) | 560/610/660/710 |
| Track ground contact length (mm) | 3150 |
| Track shoes (each side) | 41 |
| 🔧 Chassis Data | |
| Track pitch (mm) | 228.6 |
| Track rollers (each side) | 2 |
| Carrier rollers (each side) | 7 |
| ⛽ Oil Capacity | |
| Fuel tank (large) | 640 |
| Hydraulic oil tank (L) | 97 |
| Working Equipment | |
| Blade type | Semi-U coal blade/U coal blade |
| Blade width (mm) | 4806 / 4520 |
| Blade height (mm) | 1710 / 1710 |
| Blade lift height (mm) | 1560 |
| Digging depth (mm) | 560 |
| Ripper type | Single-shank/Three-shank |
| Ripping depth (mm) | Single-shank: 1250 / Three-shank: 842 |
| Ripper lift height (mm) | Single-shank: 955 / Three-shank: 883 |
| Towing structure | None |
The SD32W heavy-duty rock bulldozer is professionally customized for mining and rocky working conditions. It features advanced technical configuration, high structural rigidity, low fuel consumption, and convenient maintenance. Equipped with a thickened high-wear-resistant rock blade and reinforced push rod assembly, it is ideal equipment for quarrying, weathered rock stripping, rocky soil excavation, and heavy-load crushing construction in mountainous areas.
| SD32W Rock Version Bulldozer Parameters | |
|---|---|
| 📊 Performance Parameters | |
| Operating weight (kg) | 40900 (with single-shank ripper and ROPS) |
| Minimum turning radius (mm) | 3800 |
| Ground pressure (kPa) | 99.4 |
| 🔥 Engine | |
| Engine model | WP12 / QSNT–C345 |
| Rated power/speed (kW/rpm) | 258/2000, 257/2000 |
| 📏 Overall Dimensions | |
| Overall dimensions (mm) | 8650 × 4130 × 3760 |
| 🏃 Travel Performance | |
| Forward speed (km/h) | F1: 0–3.6 / F2: 0–6.6 / F3: 0–11.5 |
| Reverse speed (km/h) | R1: 0–4.4 / R2: 0–7.8 / R3: 0–13.5 |
| Ground clearance (mm) | 500 |
| 🛞 Chassis System | |
| Track gauge (mm) | 2140 |
| Track shoe width (mm) | 560/610/660/710 |
| Track ground contact length (mm) | 3150 |
| Track shoes (each side) | 41 |
| 🔧 Basic Chassis Data | |
| Track pitch (mm) | 228.6 |
| Track rollers (each side) | 2 |
| Carrier rollers (each side) | 7 |
| ⛽ Fuel Tank Capacity | |
| Fuel tank (large) | 640 |
| Hydraulic oil tank (L) | 97 |
| Working Equipment | |
| Blade type | Rock straight/Rock angle/Rock semi-U |
| Blade width (mm) | 4130 / 5000 / 4130 |
| Blade height (mm) | 1590 / 1140 / 1710 |
| Blade lift height (mm) | 1560 / 1703 / 1560 |
| Digging depth (mm) | 560 / 630 / 560 |
| Ripper type | Single-shank/Three-shank |
| Ripping depth (mm) | Single-shank: 1250 / Three-shank: 842 |
| Ripper lift height (mm) | Single-shank: 955 / Three-shank: 883 |
| Towing device | None |
The SD32D desert-specific bulldozer is optimized for high-temperature, strong-wind, and heavy-dust desert working environments. It is equipped with a high-position dust-proof intake filter and an enhanced large-capacity cooling radiator, with professional sand-proof protection structure. Standard 710mm wide shock-absorbing tracks effectively reduce vehicle vibration and component wear, perfectly adapting to the harsh high-sand environment of the Gobi Desert. It is widely used in desert reclamation, desert road paving, and infrastructure construction in arid regions.
| SD32D Desert Version Bulldozer Parameters | |
|---|---|
| 📊 Performance Indicators | |
| Operating weight (kg) | 39500 (with single-shank ripper and ROPS) |
| Minimum turning radius (mm) | 3800 |
| Ground pressure (kPa) | 96 |
| 🔥 Engine Parameters | |
| Engine model | QSNT-C345 |
| Rated power/speed (kW/rpm) | 257/2000 |
| 📏 External Dimensions | |
| Overall dimensions (mm) | 8650 × 4130 × 3760 |
| 🏃 Driving Performance | |
| Forward speed (km/h) | F1: 0–3.6 / F2: 0–6.6 / F3: 0–11.5 |
| Reverse speed (km/h) | R1: 0–4.4 / R2: 0–7.8 / R3: 0–13.5 |
| Ground clearance (mm) | 500 |
| 🛞 Chassis Configuration | |
| Track gauge (mm) | 2140 |
| Track shoe width (mm) | 560/610/660/710 |
| Track ground contact length (mm) | 3150 |
| Track shoes (each side) | 41 |
| 🔧 Basic Chassis Information | |
| Track pitch (mm) | 228.6 |
| Track rollers (each side) | 2 |
| Carrier rollers (each side) | 7 |
| ⛽ Oil Storage Capacity | |
| Fuel tank (large) | 640 |
| Working hydraulic oil tank (L) | 97 |
| Working Attachments | |
| Blade type | Straight/Angle/Semi-U |
| Blade width (mm) | 4130 / 5000 / 4130 |
| Blade height (mm) | 1590 / 1140 / 1710 |
| Blade lift height (mm) | 1560 / 1703 / 1560 |
| Digging depth (mm) | 560 / 630 / 560 |
| Ripper type | Single-shank/Three-shank |
| Ripping depth (mm) | Single-shank: 1250 / Three-shank: 842 |
| Ripper lift height (mm) | Single-shank: 955 / Three-shank: 883 |
| Towing equipment | None |
The SD32R sanitation-specific bulldozer is developed for the operational needs of urban waste treatment plants. It is equipped with a large-capacity environmental protection blade, anti-winding track carrier rollers, fully enclosed trolley guards, split front guardrails, and anti-clogging air pre-filter device. It is mainly used for landfill disposal, site leveling, waste stacking and compaction, and waste yard organization, and can also be used for garbage bin towing and auxiliary operations in environmental protection projects.
| SD32R Sanitation Version Bulldozer Parameters | |
|---|---|
| 📊 Working Performance | |
| Operating weight (kg) | 37100 (with cleaning device and ROPS) |
| Minimum turning radius (mm) | 3800 |
| Ground pressure (kPa) | 90.2 |
| 🔥 Engine Configuration | |
| Engine model | QSNT-C345 |
| Rated power/speed (kW/rpm) | 257/2000 |
| 📏 Overall Dimensions | |
| Overall dimensions (mm) | 8650 × 4332 × 3760 |
| 🏃 Travel Speed | |
| Forward speed (km/h) | F1: 0–3.6 / F2: 0–6.6 / F3: 0–11.5 |
| Reverse speed (km/h) | R1: 0–4.4 / R2: 0–7.8 / R3: 0–13.5 |
| Ground clearance (mm) | 500 |
| 🛞 Chassis Structure | |
| Track gauge (mm) | 2140 |
| Track shoe width (mm) | 560/610/660/710 |
| Track ground contact length (mm) | 3150 |
| Number of track shoes (each side) | 41 |
| 🔧 Chassis Technical Data | |
| Track pitch (mm) | 228.6 |
| Track rollers (each side) | 2 |
| Carrier rollers (each side) | 7 |
| ⛽ Fuel Tank Specifications | |
| Fuel tank capacity (L) | 640 |
| Hydraulic oil tank (L) | 97 |
| Working Equipment | |
| Blade type | Special sanitation blade |
| Blade width (mm) | 4502 |
| Blade height (mm) | 2314 |
| Maximum blade lift height (mm) | 1560 |
| Maximum digging depth (mm) | 560 |
| Ripping device | Not equipped |
| Ripping depth | — |
| Ripper lift height | — |
| Trailer frame | — |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.