
Medium Excavator
This 15-ton-class crawler excavator has an operating weight of 15,000 kg, rated power of 110 kW, and bucket capacity of 0.6 m³, making it suitable for various engineering projects.
Equipped with a well-known domestic engine, it delivers stable and abundant power to meet the demands of daily operations and high-efficiency construction environments.
Through precise component matching and advanced energy-saving control technology, fuel consumption is optimized to achieve a perfect balance between high productivity and low operating costs.
The integration of a new-generation cooling fan and high-capacity muffler effectively reduces operating noise and significantly improves the overall working environment.
The machine adopts turbocharging technology and offers excellent high-altitude adaptability, ensuring reliable performance in plateau environments.
The unique funnel-shaped fan shroud design optimizes air intake and thermal management, enabling stable, continuous operation even under heavy workloads.
Core hydraulic components are sourced from globally renowned brands. The main pump, valves, swing motor, and travel motor are all of professional-grade quality, ensuring the machine's long-term stability.
By integrating industry-leading R&D achievements, the hydraulic system design has been refined to maximize response efficiency and simplify control while maintaining low energy consumption.
The swing control system has been enhanced to better absorb vibration, achieve precise stopping, and provide ample torque reserve for demanding tasks in various scenarios.
The main cylinders (boom, arm, bucket) feature built-in cushioning structures that minimize impact and vibration during operation, effectively extending the service life of mechanical components.
Using dual-pump confluence technology, the oil flow to each cylinder is increased, thereby shortening cycle times and significantly improving construction productivity.
The cross-section of the track frame has been redesigned to prevent mud accumulation, thereby reducing roller wear and improving the machine's overall structural durability.
Key joints on the arm adopt a forged structure. By optimizing the shape and plate thickness, stress is better distributed, further enhancing long-term structural integrity.
The boom is manufactured using a high-strength integrated welding process, followed by precision drilling and shot peening to strengthen the structure and minimize the risk of cracks or weld failures.
The bucket's cutting edge is made of special wear-resistant steel, paired with reinforced teeth and side cutters, delivering excellent performance in heavy-duty digging scenarios.
Thickened steel plates and lateral reinforcement guards provide superior wear resistance, ensuring the equipment remains durable throughout its lifecycle.
The flat-bottom bucket design ensures a perfectly flat surface during finishing work, thereby improving the overall quality of the job site.

Visibility has been comprehensively optimized, with enlarged front, side, and rear windows that effectively reduce blind spots and improve operational safety and site efficiency.
The enlarged skylight improves upward visibility and ventilation; all windows use high-strength tempered glass and are equipped with sunshades to reduce glare and heat.
The interior layout follows strict ergonomic principles, placing all controls within natural reach to minimize operator fatigue during long shifts.
Lightweight and responsive control levers ensure easy operation and precision, reducing physical strain on the operator.
The carefully finished cab features a high-definition LCD display and premium seat, providing an exceptionally comfortable operating experience.
The integrated HVAC system provides rapid cooling and heating, enabling year-round operation regardless of external weather conditions.

The electronic throttle control system intelligently manages engine output, ensuring maximum efficiency and fuel economy under various working conditions.
The intelligent auto-idle function automatically lowers engine speed if no operation is detected within 5 seconds, effectively saving fuel and reducing ambient noise.
The multifunction large-screen LCD monitor provides real-time digital feedback on engine status, including speed, water temperature, and oil pressure.
Control switches are centrally located on the touchscreen, enabling intuitive navigation and quick function switching.
The machine is equipped with a GPS satellite system, supporting remote diagnostics, fault alarms, and automatic maintenance reminders for proactive management.
The oil filter, pilot filter, fuel filter, and water separator are all located at ground level for quick and easy routine maintenance.
The large-capacity fuel tank extends operating time and reduces downtime caused by frequent refueling.
The spacious onboard toolbox conveniently stores necessary tools and spare parts, keeping everything needed within reach.
By selecting premium components, maintenance intervals can be extended, overall operating costs reduced, and machine uptime increased.
| Performance parameters | |
| Bucket capacity (m³) | 0.6 |
| Swing speed (rpm) | 0-12 |
| Maximum gradeability (°) | 30 |
| Maximum bucket digging force (KN) | 91 |
| Maximum arm digging force (KN) | 55 |
| Engine model | WP 4.1N |
| Power/speed (KW/rpm) | 110/2000 |
| Tire model | - |
| System pressure (MPa) | 32 |
| Working range | |
| Maximum digging height (mm) | 8627 |
| Maximum dumping height (mm) | 6025 |
| Maximum digging depth (mm) | 5343 |
| Maximum vertical digging depth (mm) | 4790 |
| Maximum digging radius (mm) | 8198 |
| Minimum swing radius (mm) | 2770 |
| Overall dimensions | |
| Overall dimensions L*W*H (mm) | 7737*2500*2847 |
| Cab height (mm) | 2847 |
| Wheelbase (mm) | 2950 |
| Wheel (track) gauge (mm) | 2000 |
| Minimum ground clearance (mm) | 380 |
| Tail swing radius (mm) | 2389 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.