
Medium Excavator
The Shanbo SH210 is a new-generation high-performance 21-ton crawler excavator designed for maximum efficiency and excellent mobility across various digging tasks. Its main advantages include powerful digging force (126/134KN) paired with a large 1.0 cubic meter bucket. The machine is equipped with reliable engine options (WP4.6NG175 / 6BTAA5.9) delivering 129/153kW, supported by a 34.3MPa high-pressure dual-pump hydraulic system (2×231.7L/min) to ensure outstanding productivity. It can reach travel speeds of 28-35 km/h with gradeability ≥70%, enabling rapid site transfers.
The excavator offers a wide working range, with a maximum digging depth of 6.35 meters and a maximum digging radius of 9.7 meters. Core components such as the engine, motor, and hydraulic pump are covered by a one-year comprehensive warranty, backed by a dedicated professional after-sales team. The SH210 is in stock and can ship immediately within 1 to 7 days, with a minimum order quantity of just one unit, making it the perfect solution for engineering projects requiring high power and rapid mobility.
Brand Name | Shanbo SH210 Excavator |
Condition | New |
Mobility | Crawler Excavator |
Operating Weight | 21 tons |
Bucket Capacity | 1.0 m³ |
Max Digging Height | 10600mm |
Max Digging Depth | 6350mm |
Max Digging Radius | 9700mm |
Wheelbase | 2900mm |
Max Digging Force | 126/134KN |
Minimum Ground Clearance | 345mm |
Rated Speed | 28-35km/h |
Gradeability | ≥70% |
Engine Model | WP4.6NG175/6BTAA5.9 |
System Pressure | 34.3MPa |
Hydraulic Flow | 2×231.7 L/min |
Core Selling Point | Powerful Digging Force |
Power | 129/153kW |
Core Component Warranty | 1 year |
Core Components | Engine, Motor, Hydraulic Pump |
Product Name | Shanbo SH210 Crawler Excavator |
Model | SH210 Crawler Excavator |
Shipping Method | Sea Freight |
Payment Methods | T/T, Western Union, PayPal |
Service | Professional After-sales Support |
Stock | In Stock |
Delivery Time | 1-7 days |
MOQ | 1 Unit |
After-warranty Service | Video Technical Support |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.