
Medium Excavator
📌 The SH240-8 is a high-performance 23.2-ton crawler excavator designed for heavy construction, earthmoving, quarrying, road engineering, and municipal projects. Equipped with a Cummins 6BTAA5.9 turbocharged engine, an efficient hydraulic system, and a reinforced undercarriage structure, it delivers strong digging force, stable output, excellent travel performance, and a wide working range to meet long-term high-intensity operation under various complex working conditions.
Powered by an original Cummins 6BTAA5.9 inline turbocharged engine with a 6-cylinder design, 6.7 L displacement, 133 kW rated power at 2000 rpm, and 708 N·m maximum torque. The engine adopts high-pressure common rail technology, offering ample power reserve, low fuel consumption, strong torque output, and excellent adaptability to high loads and harsh working environments.
The SH240-8 is equipped with a 1.2 m³ standard bucket, matched with 146 kN bucket digging force and 107 kN arm digging force. The reinforced boom structure and rational force design greatly improve digging efficiency and loading capacity, easily handling hard soil, rock excavation, and heavy material handling tasks.
Equipped with variable displacement piston main pumps, the maximum working flow reaches 2×224 L/min. The travel circuit pressure of 34.3 MPa, swing pressure of 25.5 MPa, and control pressure of 3.9 MPa are reasonably matched to achieve sensitive operation, smooth compound movements, energy saving and high efficiency, and lower overall operating costs.
Adopts variable piston travel motors with two travel speeds of 3.1 km/h and 5.1 km/h. The maximum traction force is 214 kN, and the gradeability reaches 35° (70%). It maintains stable travel performance on muddy roads, slopes, and rugged construction sites, with strong site passability.
Full heavy-duty track configuration: track length 4460 mm, overall track width 2800 mm, and thickened 600 mm track shoes. Each side is equipped with 9 track rollers and 2 carrier rollers; the wear-resistant and impact-resistant design extends service life. Ground pressure is controlled at 49.8 kPa, effectively preventing sinking on soft ground.
Complete working dimension advantages: maximum digging height 10095 mm, maximum dumping height 7190 mm, maximum digging depth 6490 mm, and maximum horizontal digging reach 9860 mm. The compact minimum swing radius ensures flexible operation in narrow spaces and adapts to diverse construction scenarios.
Equipped with a swashplate piston swing motor, the swing speed is 12.4 r/min, providing smooth and uniform rotation. A hydraulic braking device enables smooth stopping and anti-slip protection during slope operations, improving overall travel safety and construction stability.
Equipped with a 330 L large fuel tank and a 250 L hydraulic oil tank, matched with a rational cooling system and oil capacity. It supports long continuous operation, reduces frequent refueling and maintenance frequency, and effectively improves construction continuity and work efficiency.
| Basic Parameters | |
| Model | SH240-8 |
| Operating Weight (kg) | 23200 |
| Working Width (Track Width) (mm) | 600 |
| Ground Pressure (kPa) | 49.8 |
| Boom Type | Shanbo Construction Machinery |
| Engine | |
| Engine Model | Cummins 6BTAA5.9 |
| Engine Type | High-pressure common rail, inline turbocharged |
| Cylinder - Bore × Stroke (mm) | 6 - 102 × 120 |
| Displacement (L) | 6.7 |
| Rated Power (kW/rpm) | 133 / 2000 |
| Maximum Torque (N·m/rpm) | 708 / 1500 |
| Bucket | |
| Bucket Capacity (m³) | 1.2 |
| Bucket Width (mm) | 1254 |
| Number of Bucket Teeth | - |
| Digging Force | |
| Bucket Digging Force (kN) | 146 |
| Arm Digging Force (kN) | 107 |
| Arm Length (mm) | 2925 |
| Arm Type | - |
| Hydraulic System | |
| Pump Type | Variable piston pump |
| Maximum Working Flow (L/min) | 2 × 224 |
| Travel Circuit Pressure (MPa) | 34.3 |
| Swing Circuit Pressure (MPa) | 25.5 |
| Control Circuit Pressure (MPa) | 3.9 |
| Travel System | |
| Travel Motor Type | Variable piston motor |
| Travel Speed (km/h) | 5.1 / 3.1 |
| Traction Force (kN) | 214 |
| Gradeability | 70% (35°) |
| Undercarriage | |
| Track Length (mm) | 4460 |
| Track Width (mm) | 2800 |
| Track Shoe Width (mm) | 600 |
| Specifications (mm) | 2380 |
| Number of Track Rollers (per side) | 2 × 9 |
| Number of Carrier Rollers (per side) | 2 × 2 |
| Number of Track Shoes (per side) | 2 × 49 |
| Swing System | |
| Swing Motor Type | Swashplate piston motor |
| Swing Speed (r/min) | 12.4 |
| Brake Type | Hydraulic brake |
| Dimensions | |
| A — Overall Length (mm) | 9625 |
| B — Ground Contact Length (Transport) (mm) | 4915 |
| C — Overall Height (to top of boom) (mm) | 3075 |
| E — Overall Width (mm) | 2980 |
| F — Counterweight Ground Clearance (mm) | 1055 |
| G — Minimum Ground Clearance (mm) | 466 |
| H — Tail Swing Radius (mm) | 2920 |
| Wheelbase (mm) | 3655 |
| J — Track Length (mm) | 4460 |
| K — Specifications (mm) | 2380 |
| L — Track Width (mm) | 2800 |
| M — Track Shoe Width (mm) | 600 |
| O — Hood Height (mm) | 2395 |
| P — Turntable Width (mm) | 2725 |
| Q — Distance from Swing Center to Rear End (mm) | 2920 |
| Working Range | |
| A — Maximum Digging Height (mm) | 10095 |
| B — Maximum Dumping Height (mm) | 7190 |
| C — Maximum Digging Depth (mm) | 6490 |
| D — Maximum Vertical Digging Depth (mm) | 5915 |
| F — Maximum Digging Reach (mm) | 9860 |
| G — Maximum Ground Digging Reach (mm) | 9675 |
| H — Minimum Swing Radius of Working Equipment (mm) | 2970 |
| Fluid Capacities | |
| Fuel Tank Capacity (L) | 330 |
| Cooling System Capacity (L) | 28 |
| Engine Oil Capacity (L) | 23.7 |
| Hydraulic Oil Tank/System Capacity (L) | 250 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.