
Medium Loader
The 930X-1 electric wheel loader is a high-performance electric loading device that integrates efficient power, flexible operation, and human-centered design. With excellent performance parameters and reliable component configuration, it is suitable for various light- and medium-load scenarios and provides green and efficient operational solutions.
Equipped with a permanent magnet synchronous drive motor with a rated power of 20kW and a peak power of 32kW, it delivers strong power output while achieving zero emissions. The 76kW/h capacity and 83.2V rated voltage Heding battery ensure long working hours, and the 15kW portable charger supports convenient charging to meet on-site work needs.
With a maximum rated load of 2000kg and a bucket capacity of 0.8m3, it can efficiently complete loading and unloading tasks. The maximum unloading height of 3600mm and unloading distance of 950mm meet daily operation requirements, while the maximum speed of 38km/h and maximum gradeability of 30° ensure stable operation under different working conditions.

It adopts the Qingzhou Weixu single-stage planetary reduction drive axle, providing stable power transmission and strong load-bearing capacity. The hydraulic system with an operating pressure of 16MPa runs smoothly, and the one-piece stamped hood and counterweight enhance structural strength, effectively extending the service life of the whole machine.
With overall dimensions of 5800×2080×2900mm and a minimum turning radius of 6500mm, it moves flexibly in narrow spaces. The single-lever operation simplifies operation and reduces the operator's learning cost, while the 2500mm wheelbase and 1800mm track ensure stable operation during movement.
Equipped with air-over-oil caliper disc four-wheel service brakes, it provides strong braking force and stable braking performance. The manual caliper disc parking brake ensures safe parking even on slopes, effectively avoiding safety hazards during operation and ensuring the safety of operators and equipment.
Equipped with a luxury soft-package cab, it has a spacious interior and a wide field of view, reducing operator fatigue during long working hours. The control components are rationally laid out for more convenient operation, and the overall design is human-centered, greatly improving operating comfort.
Equipped with 16/70-20 Qingdao Hongchi tires, they offer strong wear resistance and grip and adapt to various road conditions. The centralized layout of components and reasonable structural design make daily maintenance more convenient, reducing maintenance time and cost and improving equipment utilization.
The 930X-1 electric wheel loader is a cost-effective electric loading device with a total machine weight of 5560kg. It integrates efficient electric power, stable performance, flexible operation, and a comfortable driving experience. Equipped with reliable components such as the Heding battery, permanent magnet synchronous motor, and Qingzhou Weixu drive axle, it can efficiently complete loading, unloading, and transport tasks in scenarios such as construction sites, farms, and warehouses. With advantages such as green energy saving, high efficiency and reliability, and convenient maintenance, it is an ideal choice for users pursuing low-carbon and efficient operation.
| 930X-1 Electric Wheel Loader | |
|---|---|
| Performance | |
| Maximum load capacity (kg) | 2000 |
| Rated load capacity (kg) | 2000 |
| Total machine weight (kg) | 5560 |
| Maximum unloading height (mm) | 3600 |
| Unloading distance (mm) | 950 |
| Maximum gradeability | 30° |
| Bucket capacity (m³) | 0.8 |
| Maximum speed (km/h) | 38 |
| Dimensions | |
| Overall dimensions L×W×H (mm) | 5800 × 2080 × 2900 |
| Minimum turning radius (mm) | 6500 |
| Drive axle | |
| Brand | Qingzhou Weixu |
| Hub reduction type | Single-stage planetary reduction |
| Wheelbase (mm) | 2500 |
| Track (mm) | 1800 |
| Minimum ground clearance (mm) | 300 |
| Hydraulic system operating pressure (MPa) | 16 |
| Braking system | |
| Service brake | Air-over-oil caliper disc four-wheel brake |
| Parking brake | Manual caliper disc brake |
| Tires | |
| Brand | Qingdao Hongchi tires |
| Specification | 16/70-20 |
| Other features | |
| Operation method | Single-lever operation |
| Cab | Luxury soft package |
| Hood/counterweight | One-piece stamped |
| Battery | |
| Brand | Heding |
| Capacity | 76 kWh/915 Ah |
| Rated voltage (V) | 83.2 |
| Rated current (A) | 400 |
| Dimensions L×W×H (mm) | 780 × 700 × 880 |
| Drive motor | |
| Rated/peak power (kW) | 20 / 32 |
| Rated/peak speed (rpm) | 2400 / 4600 |
| Rated/peak current (A) | 230 / 420 |
| Motor type | Permanent magnet synchronous motor |
| Pump motor | |
| Rated power (kW) | 30 |
| Portable charger | |
| Output power (kW) | 15 |
| Input frequency (Hz) | 50/60 |
| Dimensions L×W×H (mm) | 540 × 280 × 500 |
| Protection rating | IP20 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.