
Mini Excavator
The SH08 mini crawler excavator is a compact, lightweight, and highly maneuverable excavation solution with an operating weight of only 800 kg. Featuring a narrow-body design, a stable crawler undercarriage, and flexible working performance, it is ideal for small-scale earthmoving, landscaping, indoor demolition, farm work, confined-space construction, and more.
The SH08 mini excavator is equipped with a KOOP 192F engine rated at 7 kW~7.5 kW, with an optional BRIGGS & STRATTON power source. It provides stable and ample power for digging and dozing operations, with low fuel consumption and easy maintenance, making it suitable for long periods of light construction work.
The SH08 has a bucket capacity of 0.025 m³, a bucket width of 340 mm, and a maximum digging force of 7.5 kN. It efficiently handles small-scale excavation, trenching, and material loading tasks, delivering stable and reliable performance for garden renovation, pipeline installation, and farm maintenance projects.
The hydraulic system uses a single gear pump with an operating pressure of 14 MPa, ensuring smooth lifting, slewing, and digging motions. The simple and robust design minimizes failure points, reduces maintenance requirements, and lowers operating costs for small business owners and rental fleets.
Ultra-narrow dimensions: overall width 720-780 mm, height 1300 mm, length 2430 mm. The crawler undercarriage system has a track width of 150 mm, a ground contact length of 1140 mm, and a minimum ground clearance of only 80 mm. Combined with a minimum slewing radius of 1100 mm, the machine can easily pass through doorways, alleys, and narrow construction sites.
The SH08 offers a wide range of working parameters: maximum digging distance 2450 mm, maximum digging depth 1200 mm, maximum digging height 2350 mm, and maximum dumping height 1600 mm. It also features a dozer blade with 120 mm lifting height and 200 mm digging depth, enabling it to level ground, push materials, and stabilize itself on uneven terrain.
The SH08 mini excavator has a travel speed of 2.2 km/h, a gradeability of 30°, and a ground pressure of only 19 kPa, allowing it to work reliably on soft ground, slopes, and uneven terrain. The low ground pressure prevents sinking, while the stable crawler undercarriage ensures safe operation under various working conditions.
The SH08 is equipped with a 12 rpm slewing speed, providing smooth and precise slewing motion, ideal for accurate material placement and loading in confined spaces. The compact slewing radius eliminates the need for extra turning space, making it perfect for indoor demolition and urban construction projects.
The SH08 mini excavator is designed for simplicity and low maintenance costs. With its lightweight structure, easily removable components, and proven engine and hydraulic parts, it minimizes routine maintenance and repair costs. It is an economical and reliable choice for small contractors, rental businesses, and private users.

| SH08 Mini Crawler Excavator — Technical Specifications | |
|---|---|
| Dimensions | |
| Overall width (mm) | 720-780 |
| Overall height (mm) | 1300 |
| Overall length (mm) | 2430 |
| Minimum ground clearance (mm) | 80 |
| Track ground contact length (mm) | 1140 |
| Track width (mm) | 150 |
| Engine | |
| Engine model | KOOP 192F |
| Optional engine | BRIGGS & STRATTON |
| Rated power | 7 kW~7.5 kW |
| Performance Parameters | |
| Operating weight (kg) | 800 |
| Bucket capacity (m³) | 0.025 |
| Bucket width (mm) | 340 |
| Ground pressure (kPa) | 19 |
| Working Range | |
| Maximum digging distance (mm) | 2450 |
| Maximum digging depth (mm) | 1200 |
| Maximum digging height (mm) | 2350 |
| Maximum dumping height (mm) | 1600 |
| Minimum slewing radius (mm) | 1100 |
| Dozer blade maximum lifting height (mm) | 120 |
| Dozer blade maximum digging depth (mm) | 200 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.