
Mini Excavator
The SH08HP hydraulic pilot mini crawler excavator is an ultra-compact micro excavator designed with hydraulic pilot control, featuring ultra-small dimensions and a lightweight 840 kg operating weight. Equipped with a 7.6 kW KOOP 192 engine, it offers precise bucket capacity and flexible travel and rotation performance. With 360° full rotation, a compact working range, and integrated dozer function, it is ideal for indoor demolition, garden trimming, micro trenching on farmland, and precision construction work in narrow spaces.
Overall length 2820 mm, overall width 943 mm, overall height 2220 mm; track width 180 mm, track length 1257 mm, body width 845 mm. The ultra-narrow and ultra-short body perfectly adapts to courtyards, greenhouses, and ultra-narrow construction passages.
Adopts the KOOP 192 engine with a rated power of 7.6 kW, low fuel consumption, stable operation, and easy maintenance, perfectly matching the needs of daily light micro-excavation work.
The whole machine has an operating weight of only 840 kg, making it light and easy to transport, with no pressure on small pavements and lawns, delivering highly flexible maneuverability.
Equipped with a 0.017 m³ fine bucket capacity, suitable for precision digging, trenching, and landscaping trimming, achieving precise operation in small projects.
A travel speed of 2.1 km/h and a rotation speed of 8 rpm ensure smooth and gentle operation; the 285 mm platform ground clearance meets daily needs for crossing small obstacles on flat and rough ground.
Hydraulic pilot control matches a 360° unlimited rotation angle, with left 45° and right 55° roll angles, providing flexible and sensitive operation with no dead zones.
Maximum digging height 1340 mm, maximum dumping height 1550 mm, maximum digging depth 1340 mm, and maximum digging radius 2600 mm, fully covering various small excavation and loading construction needs.
The dozer has a maximum digging depth of 210 mm and a maximum lifting height of 163 mm, facilitating site leveling, backfilling, and simple obstacle clearing, with multiple uses in one machine.
| SH08HP Hydraulic Pilot Mini Crawler Excavator — Technical Parameters | |
|---|---|
| Dimensions | |
| Overall length (mm) | 2820 |
| Overall width (mm) | 943 |
| Overall height (mm) | 2220 |
| Track width (mm) | 180 |
| Track length (mm) | 1257 |
| Body width (mm) | 845 |
| Engine | |
| Engine model | KOOP 192 / 7.6 kW |
| Performance Parameters | |
| Operating weight (kg) | 840 |
| Bucket capacity (m³) | 0.017 |
| Travel speed (km/h) | 2.1 |
| Rotation speed (rpm) | 8 |
| Platform ground clearance (mm) | 285 |
| Swing angle (°) | 360 |
| Roll angle (°) | Left 45° / Right 55° |
| Working Range | |
| Maximum digging height (mm) | 1340 |
| Maximum dumping height (mm) | 1550 |
| Maximum digging depth (mm) | 1340 |
| Maximum digging radius (mm) | 2600 |
| Dozer maximum digging depth (mm) | 210 |
| Dozer maximum lifting height (mm) | 163 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.