
Mini Excavator
The SH08MP mechanical pilot mini crawler excavator is a professional 0.84-ton ultra-compact mini excavator powered by a 10.2 HP Kopp 192 engine, featuring mechanical pilot control, an ultra-small footprint, and flexible performance. This 10.2 HP small excavator offers 360° full rotation, a compact working range, and integrated dozer functionality, making it the preferred choice for precision construction projects in narrow spaces.
Application scenarios: indoor demolition, garden pruning, farm micro-trenching, greenhouse construction, narrow passage work, and small precision projects.
Core advantages: 0.84-ton lightweight body, 10.2 HP low-consumption engine, 360° free rotation, ultra-narrow design, multifunctional dozer, and stable and efficient working performance.
This 0.84-ton mini excavator has an overall length of 2820 mm, overall width of 943 mm, and overall height of 2220 mm; track width is 180 mm, track length is 1257 mm, and body width is 845 mm. The ultra-narrow and ultra-short structure of this 10.2 HP excavator is perfectly suited to courtyards, greenhouses, and ultra-narrow construction passages.
This 0.84-ton compact excavator is equipped with a high-performance Kopp 192 engine with a rated power of 10.2 HP, low fuel consumption, stable operation, and easy maintenance, fully meeting the needs of daily light micro-excavation work.
This 10.2 HP mini excavator has an operating weight of only 840 kg (0.84 tons), making it light and easy to transport with no pressure on narrow pavements or lawns and bringing highly flexible mobility to various construction sites.
This 0.84-ton mechanical pilot excavator is equipped with a 0.017 cubic meter fine bucket capacity, suitable for precision digging, trenching, and landscaping pruning, achieving precise and efficient operation for small engineering projects.
This 0.84-ton mini excavator has a travel speed of 2.1 km/h and a swing speed of 8 rpm, ensuring smooth and gentle operation; the 285 mm platform ground clearance helps the 10.2 HP excavator easily pass over small obstacles on flat or rough ground.
The 10.2 HP SH08MP excavator adopts mechanical pilot control with a 360° unrestricted swing angle and roll angles of 45° left and 55° right, offering flexible and responsive operation with no dead zones and greatly improving construction efficiency.
This 10.2 HP compact excavator has a maximum digging height of 1340 mm, maximum dumping height of 1550 mm, maximum digging depth of 1340 mm, and maximum digging radius of 2600 mm, fully covering various small digging and loading construction needs.
This 0.84-ton mini excavator features a practical dozer design, with a maximum dozer digging depth of 210 mm and maximum lifting height of 163 mm, facilitating site leveling, backfilling, and simple obstacle removal, meeting multiple construction purposes with one machine.
| SH08MP Mechanical Pilot Mini Crawler Excavator — Technical Specifications (0.84 Tons, 10.2 HP) | |
|---|---|
| Dimensions | |
| Overall Length (mm) | 2820 |
| Overall Width (mm) | 943 |
| Overall Height (mm) | 2220 |
| Track Width (mm) | 180 |
| Track Length (mm) | 1257 |
| Body Width (mm) | 845 |
| Engine | |
| Engine Model | Kopp 192 / 10.2 HP (7.6 kW) |
| Performance Parameters | |
| Operating Weight (kg) | 840 (0.84 tons) |
| Bucket Capacity (m³) | 0.017 |
| Travel Speed (km/h) | 2.1 |
| Swing Speed (rpm) | 8 |
| Platform Ground Clearance (mm) | 285 |
| Swing Angle (°) | 360 |
| Roll Angle (°) | Left 45° / Right 55° |
| Working Range | |
| Maximum Digging Height (mm) | 1340 |
| Maximum Dumping Height (mm) | 1550 |
| Maximum Digging Depth (mm) | 1340 |
| Maximum Digging Radius (mm) | 2600 |
| Dozer Maximum Digging Depth (mm) | 210 |
| Dozer Maximum Lifting Height (mm) | 163 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.