
Mini Excavator
The SH10B mini crawler excavator is a 1-ton-class compact multi-purpose excavating machine designed for small earthmoving, landscaping, farm renovation, indoor demolition, and work in narrow spaces. With its lightweight crawler undercarriage, flexible working range, and reliable power configuration, it delivers stable performance for residential and light commercial projects.
The SH10B is equipped with a KOOP 192F single-cylinder air-cooled engine rated at 7 kW at 3000 rpm. A Briggs & Stratton engine is available as an optional upgrade. With a displacement of 6.8 ml/r, it provides stable power output, low fuel consumption, and easy maintenance, making it suitable for extended light construction work.
The SH10B has a bucket capacity of 0.025 m³ (120 kg rated load) and a bucket width of 380 mm, enabling efficient trenching, small-scale excavation, and material loading. The compact yet sturdy boom provides reliable digging force, making it ideal for garden work, pipe installation, and farm maintenance tasks.
The SH10B has overall dimensions of 2900×930×2180 mm, offering high maneuverability in tight spaces. Its total track length is 1230 mm, track width is 180 mm, chassis ground clearance is 132 mm, and platform ground clearance is 380 mm. Combined with a minimum swing radius of 1330 mm and a platform rear swing radius of only 784 mm, it can work flexibly in confined areas without damaging surrounding structures.
The SH10B offers a comprehensive set of working parameters to suit different tasks: - Maximum digging depth: 1750 mm - Maximum vertical digging depth: 1550 mm - Maximum digging height: 2610 mm - Maximum dumping height: 1850 mm - Maximum digging radius at ground level: 3050 mm The dozer blade provides a lift height of 345 mm and a digging depth of 255 mm, helping to level the ground, stabilize the machine, and clear debris.
The SH10B travels at a speed of 1.5 km/h, moving smoothly over various surfaces. The crawler undercarriage ensures good traction and stability on soft ground, slopes, and uneven terrain, making it suitable for outdoor construction sites and farmland environments.
The SH10B features a simple yet durable structure with easily removable components and proven engine parts. It minimizes routine maintenance and repair needs, helping small contractors, rental businesses, and private users keep operating costs low.
The SH10B mini excavator is widely used in landscaping, residential construction, farmland work, indoor demolition, pipe installation, and municipal maintenance. Its compact size, reliable performance, and versatile design make it a cost-effective choice for light construction projects worldwide.
| Performance Parameters | |
| Weight (kg) | 1000 |
| Bucket capacity (cbm/kg) | 0.025cbm/120kg |
| Bucket width (mm) | 380 |
| Engine | KOOP 192F |
| Optional engine | Briggs & Stratton |
| Bore and stroke | Single cylinder, air-cooled |
| Rated power (kW/rpm) | 7kw/3000r/min |
| Displacement (ml/r) | 6.8ml/r |
| Travel speed (km/h) | 1.5km/h |
| Overall dimensions (L x W x H) (mm) | 2900 x 930 x 2180 mm |
| Wheelbase (mm) | 910 |
| Total track length (mm) | 1230 |
| Platform ground clearance (mm) | 380 |
| Platform rear swing radius (mm) | 784 |
| Chassis width (mm) | 896 |
| Track width (mm) | 180 |
| Chassis ground clearance (mm) | 132 |
| Track height (mm) | 320 |
| Working Range | |
| Maximum digging depth (mm) | 1750 |
| Maximum vertical digging depth (mm) | 1550 |
| Maximum digging height (mm) | 2610 |
| Maximum dumping height (mm) | 1850 |
| Maximum digging radius at ground level (mm) | 3050 |
| Minimum swing radius (mm) | 1330 |
| Dozer blade maximum lift height (mm) | 345 |
| Dozer blade maximum digging depth (mm) | 255 |
| Overall Dimensions | |
| Overall dimensions (L x W x H) (mm) | 2900 x 930 x 2180 mm |
| Wheelbase (mm) | 910 |
| Total track length (mm) | 1230 |
| Chassis width (mm) | 896 |
| Track width (mm) | 180 |
| Platform ground clearance (mm) | 380 |
| Chassis ground clearance (mm) | 132 |
| Platform rear swing radius (mm) | 784 |
| Track height (mm) | 320 |
| Minimum swing radius (mm) | 1330 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.