
Small Bulldozer
Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Medium Bulldozer
Tonnage: 13–23 t
Balanced power, broad application and good value.
Large Bulldozer
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Mini Excavator
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Small Excavator
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Medium Excavator
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Large Excavator
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Wheeled Excavator
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Small Loader
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Medium Loader
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Large Loader
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Skid Steer Loader
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Backhoe Loader
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Small Pipe Layer
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Medium Pipe Layer
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Large Pipe Layer
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Single Drum Vibratory Road Roller
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Double Drum Road Roller
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Pneumatic Tire Roller
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Mini Road Roller
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Landfill Compactor
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.

Expert support · Worldwide shipping








Mini Excavator
| SH12 Mini Crawler Excavator — Technical Specifications | |
|---|---|
| Dimensions and Weight | |
| Operating weight (kg) | 980 |
| Overall dimensions L×W×H (mm) | 2150 × 930 × 2120 |
| Chassis width (mm) | 930 |
| Track shoe width (mm) | 180 |
| Track ground contact length (mm) | 1050 |
| Boom length (mm) | 1500 |
| Arm length (mm) | 850 |
| Engine and Fuel | |
| Engine model | Yanmar/Eupro |
| Power | 18 HP |
| Theoretical fuel consumption (L/h) | 0.8-1.1 |
| Performance | |
| Bucket capacity (m³) | 0.025 |
| Bucket width (mm) | 400 |
| Travel speed (km/h) | 3.0 |
| Gradeability (°) | 35 |
| Hydraulic pump type | Gear pump |
| Operation method | Mechanical |
| Swing angle (°) | 360 |
| Working Range | |
| Maximum digging depth (mm) | 1650 |
| Maximum digging height (mm) | 2570 |
| Maximum loading height (mm) | 1800 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.