
Mini Excavator
The SH15A mini crawler excavator combines ultra-compact dimensions, a powerful Laidong powertrain, and comprehensive performance specifications. It supports full 360° rotation and flexible roll-angle adaptation, with complete working-range and dozer-function parameters. It is ideal for garden renovation, agricultural trenching, municipal small projects, and narrow-space construction, offering stable travel performance and flexible operation to meet diverse small-scale construction needs.
Overall dimensions are 3320 mm long, 1100 mm wide, and 2200 mm high, with a 230 mm track width, 1500 mm track length, and 945 mm body width, perfectly suited to narrow passages, courtyards, and confined work sites.
Equipped with a reliable Laidong 385 engine rated at 18.1 kW, it delivers stable output, low fuel consumption, and strong durability, making it suitable for long continuous operation.
The machine's operating weight reaches 1400 kg, balancing structural stability and agile maneuverability for convenient on-site transfer and daily construction work.
With a 0.04 m³ bucket capacity, it efficiently handles digging, soil loading, and material handling tasks, improving daily construction efficiency.
A travel speed of 2.1 km/h and a rotation speed of 10 rpm ensure smooth travel and flexible slewing; a 380 mm platform ground clearance enhances obstacle-crossing capability on complex terrain.
It supports a 360° infinite swing angle and roll angles of 45° left and 55° right, enabling full-coverage operation with no blind spots and greatly improving construction flexibility.
Maximum digging height of 2900 mm, maximum dumping height of 1780 mm, maximum digging depth of 2000 mm, and maximum digging radius of 3500 mm meet all routine small-excavation requirements.
The dozer has a maximum digging depth of 325 mm and a maximum lifting height of 308 mm, enabling ground leveling, obstacle clearing, and site preparation — multiple functions in one machine.
| SH15A Mini Crawler Excavator — Technical Specifications | |
|---|---|
| Dimensions | |
| Overall length (mm) | 3320 |
| Overall width (mm) | 1100 |
| Overall height (mm) | 2200 |
| Track width (mm) | 230 |
| Track length (mm) | 1500 |
| Body width (mm) | 945 |
| Engine | |
| Engine model | Laidong 385 / 18.1 kW |
| Performance Parameters | |
| Operating weight (kg) | 1400 |
| Bucket capacity (m³) | 0.04 |
| Travel speed (km/h) | 2.1 |
| Rotation speed (rpm) | 10 |
| Platform ground clearance (mm) | 380 |
| Swing angle (°) | 360 |
| Roll angle (°) | Left 45° / Right 55° |
| Working Range | |
| Maximum digging height (mm) | 2900 |
| Maximum dumping height (mm) | 1780 |
| Maximum digging depth (mm) | 2000 |
| Maximum digging radius (mm) | 3500 |
| Dozer maximum digging depth (mm) | 325 |
| Dozer maximum lifting height (mm) | 308 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.