
Mini Excavator
The SH15B mini crawler excavator is an upgraded mini excavator designed for small and medium-sized engineering operations such as municipal maintenance, landscaping, farmland improvement and indoor renovation. Equipped with optional Laidong 385 and Yanmar 3TNV74F engines, it meets EURO 5 / EPA 4 emission standards and offers optimized operating weight and bucket capacity compared with similar models. With excellent working range and dual-specification packaging design, it efficiently adapts to various complex construction scenarios and meets global transportation requirements.
Equipped with two reliable engine options: LAIDONG 385 and YANMAR 3TNV74F, both renowned in the industry for durability and stability, allowing selection according to different market and operational needs.
Two power specifications are available: LAIDONG version 18.8 kW/2400 rpm and YANMAR version 11.2 kW/2400 rpm, ensuring efficient operation while maintaining low energy consumption and long service life.
Strictly complies with EURO 5 and EPA 4 emission standards, effectively reducing exhaust emissions, saving energy and protecting the environment, and fully meeting the access requirements of international markets such as Europe and the United States.
The whole machine has an operating weight of 1400 kg, balancing flexibility and stability. It is easy to transfer between construction sites and can be used in narrow spaces such as residential areas and indoor venues.
Equipped with a 0.04 m³ bucket, it offers greater loading capacity than similar mini excavators, greatly improving the efficiency of digging, scooping and material handling operations.
With a track ground contact length of 1440 mm, it provides strong ground adhesion and travel stability, and can smoothly pass through complex terrain such as mud and gravel, ensuring safe and efficient operation.
Outstanding working performance: maximum digging height 2800 mm, maximum dumping height 1850 mm, maximum digging depth 2100 mm, fully meeting the needs of various small and medium-sized digging and loading operations.
Two packaging options are available: the standard configuration wooden case size is 3350×1220×1750 mm, and the cabin version is 2650×1220×2450 mm, facilitating container loading and long-distance sea transportation and ensuring the safety of the machine during transport.
| SH15B Mini Crawler Excavator — Technical Parameters | |
|---|---|
| Engine | |
| Engine Model | Laidong 385 / Yanmar 3TNV74F |
| Power/Speed | 18.8 kW / 2400 rpm (Laidong) — 11.2 kW / 2400 rpm (Yanmar) |
| Emission Standard | EURO 5 / EPA 4 |
| Performance Parameters | |
| Operating Weight (kg) | 1400 |
| Bucket Capacity (m³) | 0.04 |
| Track Ground Contact Length (mm) | 1440 |
| Working Range | |
| Maximum Digging Height (mm) | 2800 |
| Maximum Dumping Height (mm) | 1850 |
| Maximum Digging Depth (mm) | 2100 |
| Packaging Dimensions | |
| Wooden Case Size (Standard Configuration) (mm) | 3350 × 1220 × 1750 |
| Wooden Case Size (With Cabin) (mm) | 2650 × 1220 × 2450 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.