
Mini Excavator
The SH15P mini crawler excavator is a lightweight and flexible small excavating machine tailored for narrow construction sites, landscaping renovations, farm trenching, and small municipal projects. It offers a choice of LAIDONG or YANMAR mainstream engines, complies with EURO 5 and EPA 4 emission standards, has compact body dimensions, stable operating performance, and a full set of working range parameters. It supports standard and cabin versions with wooden crate packaging to meet global shipping and delivery requirements.
Equipped with a choice of LAIDONG 385 and YANMAR 3TNV74F engines to suit different market power requirements.
The Laidong version delivers 18.8 kW at 2400 rpm, while the Yanmar version delivers 11.2 kW at 2400 rpm, maintaining stable power output under long-term working conditions.
Fully meets EURO 5 and EPA 4 emission standards, is environmentally friendly and energy efficient, and complies with market access regulations in Europe and North America.
The whole machine has an operating weight of 1200 kg, making it easy to transport and suitable for narrow roads, villas, and small indoor and outdoor construction scenarios.
Equipped with a standard 0.025 m³ bucket capacity, perfectly matched to daily small-scale excavation, soil scooping, and material handling operations.
A 1370 mm track ground contact length ensures excellent ground adhesion and travel stability, adapting to complex terrain conditions such as mud and gravel.
Maximum digging height of 2650 mm, maximum dumping height of 1800 mm, and maximum digging depth of 1800 mm meet the excavation and loading needs of most small projects.
The standard configuration wooden crate dimensions are 3150×1170×1700 mm, and the cabin version is 2600×1170×2400 mm, facilitating container loading and long-distance sea transport.
| SH15P Small Crawler Excavator — Technical Parameters | |
|---|---|
| Engine | |
| Engine Model | Laidong 385 / Yanmar 3TNV74F |
| Power / Speed | 18.8 kW / 2400 rpm (Laidong) — 11.2 kW / 2400 rpm (Yanmar) |
| Emission Standard | EURO 5 / EPA 4 |
| Performance Parameters | |
| Operating Weight (kg) | 1200 |
| Bucket Capacity (m³) | 0.025 |
| Track Ground Contact Length (mm) | 1370 |
| Working Range | |
| Maximum Digging Height (mm) | 2650 |
| Maximum Dumping Height (mm) | 1800 |
| Maximum Digging Depth (mm) | 1800 |
| Packaging Dimensions | |
| Wooden Crate Dimensions (Standard Configuration) (mm) | 3150 × 1170 × 1700 |
| Wooden Crate Dimensions (With Cabin) (mm) | 2600 × 1170 × 2400 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.