
Mini Excavator
This is a 2-ton mini crawler excavator fitted with a 0.07 m³ small bucket. Its compact, agile body delivers balanced power and control, making it suitable for precise work in enclosed spaces.
Power comes from a Kubota China Stage III engine rated at 14.2 kW at 2000 rpm. It delivers smooth power output. A well-designed fuel control system ensures good working continuity and economy for a compact machine.
Equipped with a load-sensing control system, it adjusts flow according to actual working demand to achieve optimal matching between engine and main pump. This reduces unnecessary energy loss, improves response speed and balances working efficiency with fuel economy.
It uses an integrated reinforced undercarriage manufactured by robotic automatic welding, giving stable and uniform weld quality with controllable arc and penetration. This reduces human error and enhances overall body strength and long-term durability.
The core hydraulic components all use world-renowned brand parts. System pressure reaches 21.5 MPa, ensuring stable output of 18 kN bucket digging force and 11 kN arm digging force. The machine has a low failure rate and stable performance.
The transport width is only 990 mm, the tail swing radius is only 650 mm and the minimum turning radius is 1610 mm. It can easily enter indoor, basement, greenhouse, tunnel and other confined sites, with flexible steering and a small footprint.
Maximum digging radius is 4040 mm, maximum digging depth is 2400 mm and maximum digging height is 3700 mm. With a 35° gradeability and dozer blade lift function, it can handle small projects such as trenching, backfilling, leveling and land clearing.
Hydraulic breaker piping comes as standard, allowing quick switching between hydraulic breakers, rippers, grapples, augers and other attachments. Steel tracks and rubber tracks are interchangeable. The swing boom design makes working close to walls and corners more convenient.
Suitable for indoor demolition, orchard management, municipal maintenance, greenhouse work, land reclamation, nursery trenching and fertilizing, pipeline laying, basement renovation and confined underground spaces.
| Performance parameters | |
| Bucket capacity (m³) | 0.07 |
| Swing speed (rpm) | 0-9 |
| Maximum gradeability (°) | 35 |
| Bucket digging force (KN) | 18 |
| Arm digging force (KN) | 11 |
| Engine model | Kubota China Stage III |
| Power/speed (KW/rpm) | 14.2/2000 |
| Track type | - |
| System pressure (MPa) | 21.5 |
| Working range | |
| Maximum digging height (mm) | 3700 |
| Maximum dump height (mm) | 2440 |
| Maximum digging depth (mm) | 2400 |
| Maximum vertical digging depth (mm) | 2025 |
| Maximum digging radius (mm) | 4040 |
| Minimum turning radius (mm) | 1610 |
| Maximum dozer blade ground clearance (mm) | 240 |
| Maximum dozer blade depth (mm) | 270 |
| Overall dimensions | |
| Overall length (transport) (mm) | 3555 |
| Overall width (transport/working) (mm) | 990/1300 |
| Overall height (transport) (mm) | 2290 |
| Cab height (mm) | 2290 |
| Wheelbase (mm) | 1230 |
| Track gauge (mm) | 760 |
| Minimum ground clearance (mm) | 150 |
| Tail swing radius (mm) | 650 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.