
Mini Excavator
The SH22 mini crawler excavator features an optimized dimensional design and is equipped with a reliable Laidong 385 engine, with a stable operating weight of 2200 kg. It offers larger bucket capacity, faster travel speed, and 360° full-slewing performance, along with an excellent working range and auxiliary dozer function. Suitable for municipal engineering, landscape construction, farmland development, and various small and medium construction sites, it delivers strong power, flexible operation, and high work efficiency.
Overall length 3966 mm, overall width 1060 mm, overall height 2280 mm; track length 1650 mm, track width 230 mm, body width 1060 mm. The layout is rational, the body structure is stable, and site adaptability is strong.
Equipped with a Laidong 385 engine with a rated power of 18.1 kW, it provides stable power output, low fuel consumption, and excellent durability, making it suitable for long-term continuous heavy-duty operation.

The whole-machine operating weight reaches 2200 kg, greatly enhancing overall stability and roll resistance, adapting to complex terrain and long-duration engineering operations.
Configured with a standard bucket capacity of 0.07 m³, it significantly improves digging and loading efficiency and is suitable for large-volume soil excavation and material handling.
A travel speed of 3.4 km/h and a slewing speed of 10 rpm enable rapid site transfer and flexible turning; the 390 mm platform ground clearance improves obstacle-crossing capability on rough roads.
Supports 360° free slewing with a roll angle of 45° left and 55° right, enabling all-around operation without blind spots and greatly improving construction flexibility and convenience.
Maximum digging height 3427 mm, maximum dumping height 2600 mm, maximum digging depth 2752 mm, and maximum digging radius 4519 mm, meeting various medium-duty digging and loading operation requirements.
The dozer has a maximum digging depth of 297 mm and a maximum lifting height of 230 mm, facilitating ground leveling, site preparation, and obstacle clearing for multiple uses in one machine.
| SH22 Mini Crawler Excavator—Technical Parameters | |
|---|---|
| Dimensions | |
| Overall length (mm) | 3966 |
| Overall width (mm) | 1060 |
| Overall height (mm) | 2280 |
| Track length (mm) | 1650 |
| Track width (mm) | 230 |
| Body width (mm) | 1060 |
| Engine | |
| Engine model | Laidong 385 / 18.1 kW |
| Performance Parameters | |
| Operating weight (kg) | 2200 |
| Bucket capacity (m³) | 0.07 |
| Travel speed (km/h) | 3.4 |
| Slewing speed (rpm) | 10 |
| Platform ground clearance (mm) | 390 |
| Slewing angle (°) | 360 |
| Roll angle (°) | Left 45° / Right 55° |
| Working Range | |
| Maximum digging height (mm) | 3427 |
| Maximum dumping height (mm) | 2600 |
| Maximum digging depth (mm) | 2752 |
| Maximum digging radius (mm) | 4519 |
| Dozer maximum digging depth (mm) | 297 |
| Dozer maximum lifting height (mm) | 230 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.