
Mini Excavator
The SH25A small crawler excavator adopts a streamlined overall dimension design and is equipped with a Changchai 390 engine, providing stable power output of 20 kW. The standard operating weight is 2400 kg, and the upgraded 0.1 m3 large bucket capacity ensures stable travel and swing performance. With 360° full rotation capability, an excellent working range, and a practical dozer auxiliary function, it is highly suitable for municipal engineering, landscaping, farmland improvement, and earthwork excavation projects, balancing flexibility, power, and work efficiency.
Overall length 4200 mm, overall width 1350 mm, overall height 2240 mm; track width 230 mm, track length 2000 mm, body width 1350 mm. The reasonable structural layout ensures flexible passage and stable standing at various construction sites.
Equipped with a Changchai 390 engine with rated power of 20 kW, it delivers stable power output, low fuel consumption, and strong durability, supporting long-term continuous heavy-load operation.

The whole machine has an operating weight of 2400 kg, with optimized body stability and maneuverability, adapting to construction environments on slopes, muddy ground, and complex terrain.
Equipped with a 0.1 m3 large-capacity bucket, it greatly improves excavation and earthwork efficiency and is suitable for large-scale earthwork excavation, loading, and material handling operations.
A travel speed of 2.7 km/h and a swing speed of 10 rpm ensure flexible site transfer and smooth rotation; the 295 mm platform ground clearance enhances obstacle-crossing capability on rough roads.
Supports a 360° free swing angle and roll angles of 45° left and 55° right, achieving omnidirectional operation without blind spots and greatly improving construction flexibility.
Maximum digging height 3635 mm, maximum dumping height 2385 mm, maximum digging depth 2360 mm, and maximum digging radius 4810 mm, fully meeting the needs of medium-to-large-range excavation and engineering operations.
The dozer has a maximum digging depth of 297 mm and a maximum lifting height of 230 mm, facilitating site leveling, backfilling, and obstacle clearing, achieving multiple uses in one machine.
| SH25A Small Crawler Excavator—Technical Parameters | |
|---|---|
| Dimensions and Weight | |
| Overall Length (mm) | 4200 |
| Overall Width (mm) | 1350 |
| Overall Height (mm) | 2240 |
| Body Width (mm) | 1350 |
| Track Width (mm) | 230 |
| Track Length (mm) | 2000 |
| Operating Weight (kg) | 2400 |
| Engine and Performance | |
| Engine Model | Changchai 390/20 kW |
| Bucket Capacity (m³) | 0.1 |
| Travel Speed (km/h) | 2.7 |
| Swing Speed (rpm) | 10 |
| Platform Ground Clearance (mm) | 295 |
| Swing Angle (°) | 360 |
| Roll Angle (°) | Left 45° / Right 55° |
| Working Range | |
| Maximum Digging Height (mm) | 3635 |
| Maximum Dumping Height (mm) | 2385 |
| Maximum Digging Depth (mm) | 2360 |
| Maximum Digging Radius (mm) | 4810 |
| Dozer Maximum Digging Depth (mm) | 297 |
| Dozer Maximum Lifting Height (mm) | 230 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.