
Mini Excavator
This is a 2-ton mini crawler excavator equipped with a 0.1 m³ bucket and overall dimensions of 4170*1300*2280 mm. Compact and flexible with strong power, it is suitable for precise operation in enclosed spaces, with stable and practical performance.
Equipped with a 3TE30 engine with 22.1 KW power and 2300 rpm speed, meeting China IV emission standards. Smooth torque output and excellent performance save fuel during long working hours.
Adopts a load-sensing control system that adjusts flow according to working conditions, achieving reasonable matching between the engine and main pump, reducing energy loss, improving response speed, increasing work efficiency, and lowering fuel consumption.
Integrated reinforced chassis structure manufactured with automatic robot welding, with stable arc, controllable penetration depth, and uniform welding quality, reducing human factors and improving body strength and long-term durability.
Core components of the hydraulic system are internationally renowned brands, with system pressure of 18 MPa, ensuring stable output of 15.3 KN bucket digging force and 10.5 KN arm digging force, smooth operation, and low failure rate.
Tail swing radius of 1180 mm, minimum turning radius of 2020 mm, and width of only 1300 mm. Easy to operate in narrow spaces such as indoors, basements, greenhouses, and tunnels, with flexible steering and good passability.
Maximum digging radius of 4370 mm, maximum digging depth of 2450 mm, and maximum digging height of 3700 mm. Features 30° gradeability and dozer blade lifting function, meeting the needs of trenching, backfilling, leveling, and clearing.
The boom can swing 70° to the left and 50° to the right. With flexible turning performance, it is easy to work close to walls and corners, solving the difficulty of edge-area construction with traditional excavators.
Standard hydraulic breaker piping allows quick attachment changes: hydraulic breaker, ripper, grapple, auger, etc. Steel tracks and rubber tracks can be freely swapped to adapt to different working conditions.
Suitable for indoor demolition, orchard management, municipal maintenance, greenhouse operations, land reclamation, nursery trenching and fertilizing, pipeline construction, basement renovation, narrow underground spaces, and other working conditions.
| Performance Parameters | |
| Bucket capacity (m³) | 0.1 |
| Swing speed (rpm) | 0-12 |
| Maximum gradeability (°) | 30 |
| Bucket digging force (KN) | 15.3 |
| Arm digging force (KN) | 10.5 |
| Engine model | 3TE30 |
| Power/speed (KW/rpm) | 22.1/2300 |
| Track type | - |
| System pressure (MPa) | 18 |
| Working range | |
| Maximum digging height (mm) | 3700 |
| Maximum dumping height (mm) | 2290 |
| Maximum digging depth (mm) | 2450 |
| Maximum vertical digging depth (mm) | 2160 |
| Maximum digging radius (mm) | 4370 |
| Minimum turning radius (mm) | 2020 |
| Maximum dozer blade ground clearance (mm) | 240 |
| Maximum dozer blade depth (mm) | 310 |
| Boom swing angle (left) ° | 70 |
| Boom swing angle (right) ° | 50 |
| Overall dimensions | |
| Overall dimensions L*W*H (mm) | 4170*1300*2280 |
| Cab height (mm) | 2280 |
| Wheelbase (mm) | 1230 |
| Track gauge (mm) | 1050 |
| Minimum ground clearance (mm) | 230 |
| Tail swing radius (mm) | 1180 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.