
Mini Excavator
The SH30 mini crawler excavator features a rugged overall dimension design and is equipped with a Changchai 390 engine rated at 20 kW. It has an operating weight of 2600 kg, an upgraded 0.075 m3 bucket capacity, two travel speeds, and 360° full slewing. With professional working-range data and an auxiliary dozer configuration, this model is widely suitable for municipal renovation, earthwork excavation, farmland improvement, and medium-scale construction projects, offering stable power, high efficiency, and strong terrain adaptability.
Overall length 4100 mm, overall width 1500 mm, overall height 2450 mm; track length 1950 mm, track width 250 mm, body width 1260 mm. The sturdy structural design delivers better stability and passability on complex sites.
Equipped with a high-quality Changchai 390 engine delivering 20 kW, it provides stable power performance, low fuel consumption, and reliable quality, making it suitable for long-term heavy-load continuous operation.

The machine's operating weight reaches 2600 kg, effectively improving overall stability and anti-slip capability and adapting to muddy, sloped, and various harsh working terrains.
Equipped with a standard bucket capacity of 0.075 cubic meters, it greatly improves earthwork excavation efficiency and is ideal for large-volume soil excavation and material handling operations.
Dual travel speeds of 3.1 km/h and 2.0 km/h adapt to different working and travel scenarios; a swing speed of 12 rpm matched with 297 mm platform ground clearance provides excellent obstacle-crossing capability.
Achieves a 360° unrestricted slewing angle with left 45° and right 55° roll angles, enabling all-around operation without dead zones and greatly improving construction flexibility.
Maximum digging height 3457 mm, maximum dumping height 2399 mm, maximum digging depth 2724 mm, and maximum digging radius 1901 mm, fully meeting medium-depth excavation and loading construction requirements.
The dozer has a maximum digging depth of 293 mm and a maximum lifting height of 191 mm, facilitating site leveling, backfilling, and obstacle removal for multiple uses in one machine.
| SH30 Mini Crawler Excavator — Technical Specifications | |
|---|---|
| Dimensions | |
| Overall Length (mm) | 4100 |
| Overall Width (mm) | 1500 |
| Overall Height (mm) | 2450 |
| Track Width (mm) | 250 |
| Track Length (mm) | 1950 |
| Body Width (mm) | 1260 |
| Engine | |
| Engine Model | Changchai 390 / 20 kW |
| Performance Parameters | |
| Operating Weight (kg) | 2600 |
| Bucket Capacity (m3) | 0.075 |
| Travel Speed (km/h) | 3.1 / 2.0 |
| Swing Speed (rpm) | 12 |
| Platform Ground Clearance (mm) | 297 |
| Slewing Angle (°) | 360 |
| Roll Angle (°) | Left 45° / Right 55° |
| Working Range | |
| Maximum Digging Height (mm) | 3457 |
| Maximum Dumping Height (mm) | 2399 |
| Maximum Digging Depth (mm) | 2724 |
| Maximum Digging Radius (mm) | 1901 |
| Dozer Maximum Digging Depth (mm) | 293 |
| Dozer Maximum Lifting Height (mm) | 191 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.