
Mini Excavator
This is a multifunctional mini crawler excavator equipped with a 0.12 cubic meter bucket. Flexible and efficient, it suits narrow spaces and a wide range of scenarios, with stable and practical overall performance.
Powered by a Kubota Stage IV engine with 18.5KW output and smooth torque delivery. It ensures operating power while meeting environmental emission requirements. Economical on fuel, it suits long-term continuous operation.
Equipped with a load-sensing hydraulic system that achieves proper matching between the engine and main pump. It precisely supplies flow according to working conditions, reduces energy loss, effectively improves operating efficiency and lowers fuel consumption.
Features an integrated reinforced undercarriage welded by automated robots. Welds are stable and uniform with controllable penetration depth, reducing human factors and enhancing overall body strength and long-term durability.
Core components of the hydraulic system are sourced from internationally renowned brands. Combined with 22.5MPa system pressure, they provide stable output (30KN bucket digging force, 18KN arm digging force), timely response and lower equipment failure rates.
Transport dimensions are 4915*1720*2525mm, with a tail swing radius of only 860mm. The small turning radius and good maneuverability allow easy operation in narrow sites such as indoors, basements, greenhouses and nurseries.
Maximum digging radius 5480mm, digging depth 3208mm, digging height 4800mm. Combined with 30° gradeability and dozer blade lifting function, it meets various construction needs such as trenching, backfilling, leveling and land clearing.
The standard breaker piping allows quick installation of breakers, rippers, grapples, augers and more. Steel tracks and rubber tracks are interchangeable. Equipped with a swing boom for convenient work close to walls and corners.
Suitable for indoor demolition, orchard management, municipal engineering, greenhouse operations, land clearing, nursery trenching/fertilizing, pipeline construction, basement renovation, narrow underground spaces and more.



| Performance Parameters | |
| Bucket capacity (m³) | 0.12 |
| Swing speed (rpm) | 1-11 |
| Maximum gradeability (°) | 30 |
| Maximum bucket digging force (KN) | 30 |
| Maximum arm digging force (KN) | 18 |
| Engine model | Kubota Stage IV |
| Power/speed (KW/rpm) | 18.5/2200 |
| Tire model | - |
| System pressure (MPa) | 22.5 |
| Working Range | |
| Maximum digging height (mm) | 4800 |
| Maximum dumping height (mm) | 3406 |
| Maximum digging depth (mm) | 3208 |
| Maximum vertical digging depth (mm) | 2957 |
| Maximum digging radius (mm) | 5480 |
| Minimum swing radius (mm) | 2530 |
| Maximum dozer blade ground clearance (mm) | 365 |
| Maximum dozer blade digging depth (mm) | 385 |
| Overall Dimensions | |
| Overall length (transport) (mm) | 4915 |
| Overall width (transport/working) (mm) | 1720 |
| Overall height (transport) (mm) | 2525 |
| Cab height (mm) | 2290 |
| Wheelbase (mm) | 1670 |
| Wheel (track) gauge (mm) | 1420 |
| Minimum ground clearance (mm) | 295 |
| Tail swing radius (mm) | 860 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.