
Single Drum Vibratory Road Roller
36-ton ultra-heavy-duty flagship model:
With an operating mass of up to 36,000 kg, the 366HD represents the pinnacle of compaction technology, purpose-built for the world's most demanding large-scale projects, including major dams, ports, and mining operations.
The machine generates an extraordinary centrifugal force of up to 805 kN, delivering unparalleled deep penetration and compaction capability, efficiently handling extreme rock fill and the hardest materials in record time.
The industry-best 1021 N/cm static linear load provides unmatched ground penetration, enabling the roller to crush and compact large volumes of aggregate and rock material with minimal passes for maximum efficiency.
The 2350mm ultra-wide drum, combined with a large 1700mm diameter, provides superior impact force distribution and coverage, ensuring consistent, uniform compaction across the full working width with every pass.
Advanced dual-amplitude (1.9mm/1.0mm) and dual-frequency (28Hz/32Hz) settings allow operators to tailor compaction parameters, from ultra-deep, high-impact compaction of thick layers to finishing applications.
Powered by a large 276 kW Weichai engine compliant with Tier 3 / China Stage III standards, it delivers the immense energy required for sustained high-impact compaction under the most challenging conditions.
Built with reinforced heavy-duty components, a massive frame, and the "HD" (Heavy Duty) designation, the 366HD is engineered to withstand the extreme stresses of continuous high-impact compaction on the world's toughest job sites.
The 366HD single-drum vibratory roller is a 36-ton ultra-heavy-duty flagship machine designed for the most demanding large-scale projects on earth. It combines a massive 276 kW Weichai engine with an industry-leading vibration system to deliver up to 805 kN of centrifugal force and an exceptional 1021 N/cm static linear load (the highest in its class). Featuring a large drum measuring 1700mm in diameter and 2350mm in width, advanced two-stage vibration settings, and a reinforced heavy-duty structure, the 366HD provides the ultimate solution for large dam construction, port development, mining operations, and major infrastructure projects. For contractors seeking maximum compaction power, unparalleled productivity, and uncompromising reliability, the 366HD delivers world-class performance on the most challenging job sites.
| Basic Parameters | |
| Model | KS366HD |
| Operating Weight (kg) | 36000 |
| Static Linear Load (N/cm) | 1021 |
| Amplitude (mm) | 1.9 / 1.0 |
| Vibration Frequency (Hz) | 28 / 32 |
| Centrifugal Force (kN) | 805 / 550 |
| Drum Width (mm) | 2350 |
| Drum Diameter (mm) | 1700 |
| Speed Range (km/h) | 0-9 |
| Gradeability (%) | 45 |
| Turning Radius (mm) | 7575 |
| Engine Brand | Weichai |
| Emission Standard | Tier 3 / China Stage III |
| Engine Power (kW) | 276 |
| Dimensions | |
| Overall Dimensions L×W×H (mm) | 6980 × 2690 × 3300 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.