
Skid Steer Loader
📌 The H380 skid steer loader is a micro compact multi-purpose loading machine with an operating weight of 890kg, powered by a Runtong 740 engine with an output of 16.8KW/24HP. It supports both tracked and wheeled travel types and is equipped with a 0.15m³ standard bucket and a stable hydraulic system. Its ultra-small body dimensions, flexible skid steering, and strong climbing performance make it highly suitable for narrow-space work, farm renovation, landscaping, indoor demolition, and small earthmoving projects.
The H380 skid steer loader is equipped with a reliable Runtong 740 engine with a maximum power of 16.8KW/24HP and an electric-start design for quick and easy starting. This engine offers stable power output, low fuel consumption, and a compact structure, adapting to various complex working environments and long-term frequent operation while providing reliable power support for daily loading and handling tasks.
The overall dimensions of this skid steer loader are 1750×1100×1250mm, and the bucket width is only 900mm, allowing it to easily pass through narrow passages, workshops, and confined work areas. The reasonable 850mm wheelbase, 280mm ground clearance, and 280mm tail swing design greatly improve site accessibility and flexible turning capability in limited spaces.
The H380 has a rated load of 200kg, a maximum lifting force of up to 375kg/3.0kN, and a maximum traction force of 3.5kN. Its strong overall load-bearing capacity and stable structural design meet the requirements of daily material scooping, stacking, and light earth and stone work. The reasonable force-bearing structure ensures smooth loading operation under rated conditions without deformation or shaking.
Tracked and wheeled travel types are available, matched with a stable travel speed of 6km/h and a strong climbing ability of 30°. Whether on muddy roads, rugged ground, slopes, or uneven farmland, the H380 skid steer loader maintains stable driving performance, bringing excellent off-road adaptability to complex outdoor working conditions.
Equipped with a mature hydraulic system, the rated pressure is 17MPa and the system pressure range is 17-21bar. The whole machine has a short working cycle of 5s, and the lifting, dumping, and telescoping actions are responsive. The optimized hydraulic configuration ensures smooth operation, a low failure rate, and a long service life, effectively improving overall work efficiency.
The maximum operating height is 2450mm and the dumping height is 1510mm, meeting conventional loading and unloading needs. The 450mm dumping distance, 27° dumping angle, and 114° maximum bucket tilt angle enable efficient material unloading and clearing. Multiple working-dimension advantages ensure diverse operating functions in different scenarios.
Tracked and wheeled travel modes can be selected according to the work site. The standard 0.15m3 small bucket is flexible and lightweight, suitable for fine work and material handling. The simple overall matching and reasonable component layout allow the machine to switch freely among agriculture, landscaping, municipal maintenance, and indoor construction.
The lightweight design of the whole machine reduces transportation pressure and transfer costs. The high-strength welded body and wear-resistant structural parts extend the service life. The simple mechanical structure and reasonable component layout make daily inspection, maintenance, and parts replacement more convenient, effectively reducing later operation and maintenance costs.
| Item | Value |
|---|---|
| Engine | |
| Engine model | Runtong 740 |
| Maximum power | 16.8 kW/24 HP |
| Starting method | Electric start |
| Travel type | Tracked/Wheeled |
| Bucket | |
| Bucket capacity (m³) | 0.15 |
| Dimensions | |
| Machine dimensions (mm) | 1750 × 1100 × 1250 |
| Bucket width (mm) | 900 |
| Wheelbase (mm) | 850 |
| Ground clearance (mm) | 280 |
| Tail swing (mm) | 280 |
| Performance | |
| Operating weight (kg) | 890 |
| Rated load (kg) | 200 |
| Maximum lifting force (kg) | 375 |
| Maximum lifting force (kN) | 3.0 |
| Maximum traction force (kN) | 3.5 |
| Travel speed (km/h) | 6 |
| Climbing ability | 30° |
| Hydraulic system | |
| Rated pressure (MPa) | 17 |
| System pressure range (bar) | 17-21 |
| Working cycle | 5 |
| Working range | |
| Maximum operating height (mm) | 2450 |
| Height to bucket pin (mm) | 1870 |
| Overall height (mm) | 1350 |
| Maximum height with bucket level (mm) | 1450 |
| Dumping height (mm) | 1510 |
| Dumping distance (mm) | 450 |
| Dumping angle | 27° |
| Maximum bucket tilt angle | 114° |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.