
Skid Steer Loader
📌 The H50 skid steer loader is a compact, multi-functional construction machine with an operating weight of 2,950 kg and a rated load of 870 kg. It adopts a mature 4-cylinder engine, closed-loop hydrostatic transmission system, and stable mechanical control. The H50 skid steer loader has compact dimensions, flexible steering, strong lifting force, and diverse working attachments, and is widely used in urban construction, farmland improvement, landscaping, material handling, and narrow-space operations.
The H50 skid steer loader is equipped with an efficient 4-cylinder engine with a rated power of 35.7 kW and a maximum torque of 200 N·m @ 1600 rpm. The 3.3 L displacement design balances power output and fuel economy, adapting to long-term frequent operation. It offers stable power output, low failure rate, and strong environmental adaptability, meeting daily construction needs under various working conditions.
It adopts a closed-loop hydrostatic transmission, matched with a dual swashplate axial piston variable pump and heavy-duty radial piston motors. The overall travel speed reaches 12 km/h, with sensitive power response and stable driving performance. Equipped with 800S-1R-60 standard chains and 10.0-16.5 tires, the chassis structure is sturdy and durable, suitable for complex road surfaces and frequent start-stop operations.
With a radial lift structure design, the rated lifting force and bucket breakout force both reach 22,000 N. The tipping load is as high as 1,740 kg, and the standard bucket capacity is 0.35 m³, ensuring efficient scooping and stockpiling. Excellent load-bearing performance enables the machine to easily handle light earthmoving, gravel handling, and bulk material transport tasks.
The H50 hydraulic system is set with a safety pressure of 180 bar and a rated flow of 66.2 L/min, providing stable and powerful hydraulic output. The optimized hydraulic circuit ensures smooth lifting, dumping, and travel actions, low energy consumption, and good synchronization of all working devices. Key hydraulic components are durable, effectively reducing later maintenance frequency.
It adopts classic mechanical control with simple operation logic that is easy to master. The whole machine responds sensitively with precise micro-operation performance, suitable for both novices and experienced operators. The reasonable working layout reduces operating resistance, effectively alleviating work fatigue and improving continuous operation efficiency.
The overall dimensions are ultra-compact, with a total width of only 1,740 mm and a minimum ground clearance of 185 mm. It can move freely in narrow construction sites, workshops, alleys, and limited working spaces. Flexible skid steering enables in-situ turning, greatly improving construction flexibility and site adaptability.
The maximum hinge pin height reaches 3,265 mm, the dump height is 2,551 mm, and the dump distance is reasonable, facilitating high-level loading and container feeding. The wheelbase is reasonably matched, the body structure is stable, and the center of gravity is balanced during lifting and dumping, ensuring safe and stable operation in various working postures.
The whole machine adopts a high-strength welded body and reinforced load-bearing structure, with strong impact resistance and wear resistance. The 88 L large-capacity fuel tank supports long-distance continuous operation. The overall structure layout is reasonable, with exposed maintenance points, facilitating daily inspection, oil change, and component maintenance, reducing long-term operating costs.
| Item | Value |
|---|---|
| Engine | |
| Rated Power (kW) | 35.7 |
| Maximum Torque (N·m@rpm) | 200 @ 1600 |
| Number of Cylinders | 4 |
| Displacement (L) | 3.3 |
| Drive Train | |
| Travel Speed (km/h) | 12 |
| Transmission Type | Closed-loop hydrostatic |
| Travel Pump Type | Dual swashplate axial piston variable pump |
| Travel Motor Type | Radial piston fixed motor ×2 / Radial piston two-speed variable motor |
| Chain Specification | 800S-1R-60 |
| Chain Tension Adjustment | None |
| Tire Specification | 10.0 (12.0) - 16.5 |
| Load & Capacity | |
| Rated Load (kg) | 870 |
| Tipping Load (kg) | 1740 |
| Lift Mechanism Type | Radial lift |
| Bucket Digging Force (N) | 22000 |
| Rated Lifting Force (N) | 22000 |
| Hydraulic System | |
| System Safety Pressure (bar) | 180 |
| Hydraulic System Rated Flow (L/min) | 66.2 |
| Control | |
| Control Type | Mechanical |
| Dimensions | |
| Maximum Height to Top of Cab (mm) | 2007 |
| Total Length with Bucket (mm) | 3433 |
| Total Length without Attachment (mm) | 2571 |
| Total Width at Tire Edge (mm) | 1740 |
| Total Width at Bucket Edge (mm) | 1800 |
| Wheelbase (mm) | 1050 |
| Dump Height (mm) | 2551 |
| Maximum Dump Distance (mm) | 603 |
| Maximum Bucket Hinge Pin Height (mm) | 3265 |
| Ground Clearance (mm) | 185 |
| Weight & Capacities | |
| Operating Weight with Standard Bucket (kg) | 2950 |
| Fuel Tank Capacity (L) | 88 |
| Bucket Capacity (m³) | 0.35 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.