
Skid Steer Loader
The H85 skid steer loader is a heavy-duty compact multi-functional loading equipment with an operating weight of 4200 kg and a rated load of 1400 kg. It is powered by a Zhejiang Xinchai A498BZG turbocharged engine, matched with a high-pressure hydraulic system, two-speed travel, and complete working dimension parameters. With strong digging force, large hydraulic output, and flexible skid steering, it is widely used in earthmoving, material handling, farm renovation, municipal maintenance, and multi-scenario auxiliary construction operations.
Equipped with a Zhejiang Xinchai A498BZG 4-cylinder turbocharged engine, rated power 55 kW, maximum torque 293.5 N·m, displacement 2.977 L. It meets Tier 2 / China Stage II emission standards, with stable power output at 2500 rpm rated speed, strong power reserve, low fuel consumption, and durable heavy-load operation.
Adopts high-strength working device structure design, with bucket breakout force up to 27 kN and arm breakout force up to 22 kN. Rated load 1400 kg, maximum load capacity up to 2800 kg, equipped with a 0.5 m³ standard bucket. It has strong scooping, digging, and stockpiling capabilities to meet high-intensity material loading and handling tasks.
The whole machine adopts a 210 bar working system pressure, standard flow 85 L/min, high flow 127 L/min. The optimized hydraulic circuit ensures sensitive action response and smooth compound operations. The short 10-second working cycle greatly improves construction efficiency, achieving energy-saving, stable, and efficient hydraulic drive.
Equipped with two travel modes of 11 km/h and 22 km/h, balancing operational stability and transfer efficiency. With 12-16.5 standard tires, reasonable wheelbase and ground clearance design, the machine runs smoothly on various grounds, with flexible walking and strong site adaptability.
The overall width of the machine is 1850 mm, with a compact body layout suitable for narrow space operations. The maximum operating height reaches 4224 mm, dumping height 2672 mm, and dumping distance 730 mm. Rich working angle parameters such as 42° dump angle and 98° bucket tilt angle ensure flexible and diverse unloading and construction methods.
Reasonable 1227 mm wheelbase, 215 mm ground clearance, and 25° departure angle greatly improve off-road passability. Optimized front and rear turning radii and rear overhang structure enable in-situ skid steering, with small turning radius and flexible maneuverability, suitable for complex and narrow work sites.
Equipped with a 90 L large-capacity fuel tank, effectively extending continuous working time and reducing frequent refueling. The whole machine adopts high-strength steel structure with wear-resistant parts, stable overall structure, strong impact resistance, and adaptability to long-term outdoor harsh working conditions.
The H85 skid steer loader comes with complete standard configuration and reliable overall matching, and can quickly install various auxiliary attachments. It achieves one-machine multi-purpose, covering loading, breaking, sweeping, digging, and other operations, meeting diverse construction needs in agriculture, municipal, landscaping, and engineering fields.


| H80 Skid Steer Loader – Technical Parameters | |
|---|---|
| Engine | |
| Engine Model | Zhejiang Xinchai A498BZG |
| Rated Power (kW) | 55 |
| Maximum Torque (N·m) | 293.5 |
| Rated Speed (rpm) | 2500 |
| Number of Cylinders | 4 |
| Intake Type | Turbocharged |
| Displacement (L) | 2.977 |
| Emission Standard | Tier 2 / China Stage II |
| Performance Parameters | |
| Rated Load (kg) | 1400 |
| Maximum Load (kg) | 2800 |
| Bucket Digging Force (kN) | 27 |
| Arm Breakout Force (kN) | 22 |
| Bucket Capacity (m³) | 0.5 |
| Travel Speed (km/h) | 11 / 22 |
| Working Cycle Time (s) | 10 |
| Working System Pressure (bar) | 210 |
| Standard Flow (L/min) | 85 |
| High Flow (L/min) | 127 |
| Fuel Tank Capacity (L) | 90 |
| Operating Weight (kg) | 4200 |
| Tire Model | 12-16.5 |
| Dimensions | |
| A – Maximum Operating Height (mm) | 4224 |
| B – Height to Bucket Pivot Pin (mm) | 3373 |
| C – Height to Top of Cab (mm) | 2065 |
| D – Maximum Flat Bucket Height (mm) | 3177 |
| E – Overall Length without Attachment (mm) | 2926 |
| F – Overall Length with Standard Bucket (mm) | 3624 |
| G – Maximum Dump Angle (°) | 42 |
| H – Dumping Height (mm) | 2672 |
| I – Dumping Distance (mm) | 730 |
| J – Bucket Tilt Angle on Ground (°) | 30 |
| K – Bucket Maximum Tilt Angle Height (°) | 98 |
| L – Wheelbase (mm) | 1227 |
| M – Ground Clearance (mm) | 215 |
| N – Departure Angle (°) | 25 |
| O – Front Turning Radius without Attachment (mm) | 1350 |
| P – Front Turning Radius (mm) | 2143 |
| Q – Rear Turning Radius (mm) | 1759 |
| R – Rear Overhang Length (mm) | 1088 |
| S – Wheel Tread (Standard Tires) (mm) | 1507 |
| T – Machine Width (Standard Tires) (mm) | 1850 |
| U – Bucket Width (mm) | 1880 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.