
Small Bulldozer
The SD10 125HP small bulldozer is a compact yet powerful construction machine designed for earthmoving, site leveling, and material handling tasks. With 125 horsepower, a durable undercarriage, and versatile attachments, it delivers reliable performance across a wide range of working conditions.
This 125HP bulldozer has a total weight of 10000kg and a maximum traction force of 95kN, providing strong stability and pulling power to easily handle complex construction sites.
Power comes from a Cummins 4BT3.9-C125 diesel engine with rated power of 81kW (125HP)/2300r/min, maximum torque of 400N·m, and fuel consumption of ≤242g/km·h. It combines high power output with low energy consumption and meets emission standards for environmentally friendly operation.
The bulldozer adopts a 4F+2R mechanical transmission, with forward speeds from 2.6 to 10.4 km/h and reverse speeds from 3.7 to 6.7 km/h. It moves smoothly and is easy to operate, improving construction efficiency.
Equipped with a reinforced undercarriage and optimized travel mechanism, the track shoe width is 450mm and ground pressure is only 54.4kPa. Even on soft ground, it provides excellent impact resistance and stability.
The SD10 bulldozer has overall dimensions of 4400×2960×3030mm. Its compact size allows flexible operation in narrow construction spaces without sacrificing power.
The bulldozer blade measures 2960×960mm, with a maximum lift height of 830mm and a digging depth of 350mm. Straight, curved, and coal blades are available as options to meet different working needs.
Choose fixed towing equipment or a three-tooth ripper to expand functionality. These attachments enhance the bulldozer's versatility for loosening soil, towing materials, and more.
The SD10 125HP small bulldozer stands out for its high power, low fuel consumption, rugged durability, and flexible configuration. It is ideal for municipal engineering, farmland improvement, site leveling, and mining operations, offering great value for small and medium-sized construction projects.
| SD10 Bulldozer | |
|---|---|
| Performance Parameters | |
| Total Weight (kg) | 10000 |
| Maximum Traction Force (kN) | 95 |
| Engine | |
| Engine Model | Cummins 4BT3.9-C125 |
| Rated Power/Speed (kW/r/min) | 81 / 2300 |
| Engine Fuel Consumption (g/km·h) | ≤ 242 |
| Engine Maximum Torque (N·m) | 400 |
| Travel Performance | |
| Forward 1-4 Gears (km/h) | 2.6 – 10.4 |
| Reverse 1-2 Gears (km/h) | 3.7 – 6.7 |
| Undercarriage System | |
| Track Shoe Width (mm) | 450 |
| Ground Pressure (kPa) | 54.4 |
| Overall Dimensions | |
| Dimensions (L×W×H) (mm) | 4400 × 2960 × 3030 |
| Blade Parameters | |
| Bulldozer Blade (W×H) (mm) | 2960 × 960 |
| Blade Maximum Lift Height (mm) | 830 |
| Blade Maximum Digging Depth (mm) | 350 |
| Rear Attachments | |
| Towing Equipment/Ripper (Optional) | Fixed / Three-Tooth |
| Vehicle Type | |
| Retained Vehicle Type | — |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.