
Small Excavator
Equipped with a domestic-brand engine, providing ample power output to meet the operational needs of various working conditions.
Through rational matching design and energy-saving control technology, fuel consumption is reduced, and emissions meet China IV standards.
Equipped with a new cooling fan and large-capacity muffler, the equipment runs with lower noise; turbocharging technology improves adaptability in high-altitude areas.
A funnel-shaped fan shroud optimizes engine intake and heat dissipation, supporting continuous and stable operation.
Components such as the main pump, main valve, swing motor, travel motor, cylinders, and pilot control valve are all sourced from internationally renowned brands, enhancing the overall operational stability of the machine.
Combining mature technology and optimized design, it reduces energy consumption and improves machine response speed and operational smoothness.
Swing control is smooth and precise with good vibration absorption, making stops smoother; ample torque reserve makes swing operation more powerful.
The boom, arm, and bucket cylinders are all equipped with cushioning structures, which reduce vibration and impact, lower noise, and extend cylinder service life.
Dual-pump confluence technology increases oil supply flow, speeds up boom, arm, and bucket movements, and improves work efficiency.
The optimized cross-section design of the track frame reduces mud accumulation, lowers roller wear, and enhances the overall durability of the machine.
Key joint parts of the arm adopt a forged structure with optimized shape and plate thickness to distribute stress and improve structural stability.
The boom adopts an integrated welding process and undergoes boring and surface strengthening treatment, increasing structural strength, extending the service life of pins and bushings, and reducing the risk of cracking.
The bucket cutting plate uses wear-resistant steel, suitable for heavy-load conditions; paired with wear-resistant bucket teeth and side teeth, it improves working performance.
The bucket adopts thickened steel plates and side reinforcement plate design for better wear resistance; the flat-bottom structure ensures a smoother and more regular working surface during leveling operations.
Larger front, side, and rear windows expand the cab's field of view, reducing blind spots and improving operational safety.
The skylight glass is enlarged to improve upward visibility and ventilation; the whole vehicle uses tempered glass and is equipped with a sun visor.
Control components are ergonomically arranged, and the control handles are light and flexible for convenient operation.
The cab features a fully wrapped interior, equipped with an LCD panel and comfortable seat, as well as air conditioning and heating systems with convenient temperature adjustment.

The electronic throttle control system rationally utilizes engine output to maintain stable work efficiency under different working conditions.
Auto idle function: the equipment automatically enters idle state when there is no operation for a short time, which helps save fuel and reduce noise.
The multi-function LCD monitor displays real-time operating parameters such as engine speed, water temperature, and oil pressure, making it convenient to monitor equipment status at any time.
Function switches are centrally arranged on the control panel with touch operation for convenient use.
The oil filter, pilot oil filter, fuel filter, and oil-water separator are rationally arranged and can be inspected and replaced at ground level.
The large-capacity fuel tank supports long-term continuous operation, and the large-capacity toolbox conveniently stores spare parts and tools.
High-quality components are selected to extend service life and maintenance intervals and reduce maintenance time.
| Performance parameters | |
| Bucket capacity (m³) | 0.21 |
| Swing speed (rpm) | 0-11 |
| Maximum climbing angle (°) | 35 |
| Maximum bucket digging force (KN) | 48 |
| Maximum arm digging force (KN) | 35 |
| Engine model | 4TNV94L |
| Power/speed (KW/rpm) | 35.9/2000 |
| Tire model | - |
| System pressure (MPa) | 28 |
| Working range | |
| Maximum digging height (mm) | 5928 |
| Maximum dumping height (mm) | 4228 |
| Maximum digging depth (mm) | 4159 |
| Maximum vertical digging depth (mm) | 3458 |
| Maximum digging radius (mm) | 6162 |
| Minimum swing radius (mm) | 2389 |
| Maximum ground clearance of dozer blade (mm) | 380 |
| Maximum digging depth of dozer blade (mm) | 455 |
| Overall dimensions | |
| Overall dimensions L*W*H (mm) | 5802×1960×2420 |
| Cab height (mm) | 2420 |
| Wheelbase (mm) | 2020 |
| Wheel (track) gauge (mm) | 1560 |
| Minimum ground clearance (mm) | 380 |
| Tail swing radius (mm) | 1520 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.