
Small Bulldozer
Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Medium Bulldozer
Tonnage: 13–23 t
Balanced power, broad application and good value.
Large Bulldozer
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Mini Excavator
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Small Excavator
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Medium Excavator
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Large Excavator
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Wheeled Excavator
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Small Loader
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Medium Loader
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Large Loader
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Skid Steer Loader
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Backhoe Loader
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Small Pipe Layer
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Medium Pipe Layer
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Large Pipe Layer
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Single Drum Vibratory Road Roller
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Double Drum Road Roller
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Pneumatic Tire Roller
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Mini Road Roller
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Landfill Compactor
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.

Expert support · Worldwide shipping






Small Excavator


| Mini Excavator (WP3.2 Tier IV) | |
|---|---|
| Specifications | |
| Operating weight (kg) | 5960 |
| Bucket capacity (m³) | 0.11~0.28 (0.25) |
| Engine model | WP3.2 (Tier IV) |
| Rated power (kW/rpm) | 36.8/2200 |
| Travel speed (km/h) | 4.0/2.2 |
| Max. swing speed (r/min) | 11 |
| Gradeability | 70% (35°) |
| Ground pressure (kPa) | 32 |
| Bucket digging force (kN) | 51 |
| Arm digging force (kN) | 35.5 |
| Overall dimensions (mm) | |
| A - Overall length | 5870 |
| B - Track length (transport) | 3320 |
| C - Overall height (to top of boom) | 2025 |
| D - Overall width | 2000 |
| E - Overall height (to top of cab) | 2675 |
| F - Counterweight ground clearance | 730 |
| G - Minimum ground clearance | 370 |
| H - Tail swing radius | 1680 |
| I - Track width (overall) | 2060 |
| J - Track length (on ground) | 2575 |
| K - Gauge | 1600 |
| L - Track width (total width) | 2000 |
| M - Track shoe width | 400 |
| P - Upper structure width | 1880 |
| Q - Distance from swing center to rear end | - |
| Working range (mm) | |
| A - Max. digging height | 5710 |
| B - Max. dumping height | 4135 |
| C - Max. digging depth | 3780 |
| D - Max. vertical digging depth | 2635 |
| F - Max. digging reach | 6140 |
| G - Max. digging reach on ground | 6000 |
| H - Minimum swing radius of working equipment | 2435 |
| I - Max. blade lifting height | 360 |
| J - Max. blade cutting depth | 490 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.