
Small Excavator
Equipped with a domestic-brand engine, it delivers stable power performance and meets the needs of efficient operation under various working conditions.
Through refined matching and energy-saving control strategies, it helps reduce fuel consumption; combined with a new cooling fan and large muffler, it delivers better noise performance during operation.
Equipped with turbocharging technology to enhance adaptability to high-altitude environments; the funnel-shaped fan shroud design optimizes engine intake and heat dissipation and supports long-term stable operation.
The hydraulic system adopts dual-pump confluence and full hydraulic pilot control, supporting 360-degree rotation. It is equipped with imported hoses, an original imported variable displacement piston pump, imported main valve, imported swing assembly, and imported travel assembly. Equipped with a broken pipeline system, the whole machine runs more stably.
Combining optimized design and mature technology, it reduces energy consumption and improves response speed, making operation movements smoother.
Swing control is precise and stable, with excellent vibration absorption and smoother stopping; ample torque reserve makes swing operation more reliable.
The boom, arm, and bucket cylinders are all provided with buffer structures to reduce vibration and impact during operation, lower noise, and extend cylinder service life.
Dual-pump confluence technology increases oil supply flow, speeds up the movement of the boom, arm, and bucket, and improves overall operating efficiency.
The cross-sectional structure of the track frame is optimized to reduce mud adhesion and accumulation, lower roller wear, and improve overall machine durability.
Key joint parts of the arm adopt a forged structure. Through optimization of shape and plate thickness, stress is distributed and structural durability is improved.
The arm frame adopts an integrated welding process and has undergone boring and surface strengthening treatment, increasing structural strength, extending the service life of pins and bushings, and reducing the risk of cracking.
The bucket cutting plate uses wear-resistant steel, suitable for heavy-load scenarios; combined with wear-resistant bucket teeth and side teeth, performance is more reliable.
The bucket uses thickened plates and side reinforcement plates for better wear resistance; the flat-bottom structure ensures a smoother working surface during leveling operations.

The cab visibility has been comprehensively optimized, with enlarged front, side, and rear windows, effectively reducing blind spots and improving operating safety.
The skylight glass is enlarged to improve upward visibility and ventilation; tempered glass is used throughout, with a sun visor.
Control components are arranged according to ergonomics, and the control levers are light and easy to operate, reducing fatigue during long working hours.
The cab adopts a fully wrapped interior, equipped with a liquid crystal panel and comfortable seat, as well as air conditioning and heating systems with convenient temperature adjustment.
The electronic throttle control system reasonably distributes engine output, enabling the machine to maintain stable efficiency under different working conditions.
Auto idle function: when the machine is not operated for a short time, it automatically enters idle state, helping save fuel and reduce noise.
The multi-function LCD monitor displays real-time parameters such as engine speed, water temperature, and oil pressure, making it convenient for operators to monitor machine status at any time.
Function switches are centrally arranged on the control panel with a touch-type design, making operation simple and intuitive.
Equipped with a GPS satellite positioning system, supporting remote diagnosis, fault warning, and automatic maintenance reminders.
The oil filter, pilot oil filter, fuel filter, and oil-water separator are reasonably arranged and can be inspected and replaced at ground level.
The large-capacity fuel tank supports long-term continuous operation, and the large-capacity toolbox conveniently stores spare parts and tools.
High-quality components are selected to extend service life and maintenance intervals and reduce maintenance time.
| Performance Parameters | |
| Bucket capacity (m³) | 0.28 |
| Swing speed (rpm) | 0-11 |
| Maximum gradeability (°) | 35 |
| Maximum bucket digging force (KN) | 56 |
| Maximum arm digging force (KN) | 38 |
| Engine model | 4TNV94L |
| Power/speed (KW/rpm) | 35.9/2000 |
| Tire model | - |
| System pressure (MPa) | 27 |
| Working Range | |
| Maximum digging height (mm) | 7023 |
| Maximum dumping height (mm) | 5195 |
| Maximum digging depth (mm) | 3898 |
| Maximum vertical digging depth (mm) | 2968 |
| Maximum digging radius (mm) | 6182 |
| Minimum swing radius (mm) | 1740 |
| Maximum dozer blade ground clearance (mm) | 382 |
| Maximum dozer blade digging depth (mm) | 332 |
| Overall Dimensions | |
| Overall dimensions L*W*H (mm) | 6121*2216*2672 |
| Cab height (mm) | 2672 |
| Wheelbase (mm) | 2209 |
| Wheel (track) gauge (mm) | 1745 |
| Minimum ground clearance (mm) | 375 |
| Rear swing radius (mm) | 1730 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.