
Small Excavator
The unit adopts a top domestic brand engine with strong and stable power output, making it ideal for standard tasks and high-intensity industrial applications.

Precision-engineered component matching combined with advanced energy-saving technology ensures optimal fuel economy without compromising operating efficiency.
The integration of a new-generation cooling fan and large-capacity muffler significantly reduces operating noise and creates a more comfortable working environment.
The machine adopts turbocharging technology with excellent high-altitude adaptability, ensuring stable performance in plateau environments.
The unique funnel-shaped fan shroud design optimizes air intake and heat dissipation for continuous and stable operation under high loads.
Core hydraulic components all come from globally renowned manufacturers. The main pump, valves, and swing motor offer outstanding reliability, ensuring long-term machine operation.
By integrating industry-leading R&D achievements, the hydraulic system design has been refined to maximize response efficiency and simplify control while maintaining low energy consumption.
The swing control system has been enhanced to better absorb vibration, achieve precise stopping, and provide ample torque reserve for various demanding tasks.
All main cylinders (boom, arm, bucket) have built-in cushioning structures to minimize impact and vibration, effectively extending the service life of mechanical components.
Utilizing dual-pump confluence technology, the oil flow to each cylinder is increased, thereby shortening cycle times and significantly improving construction productivity.

The cross-section of the track frame has been redesigned to prevent mud accumulation, thereby reducing component wear and extending the overall service life of the machine.
Key joints on the arm adopt a forged structure. By optimizing the shape and plate thickness, stress concentration is reduced, further improving structural durability.
The boom is made with a high-strength integrated welding process, then precision-drilled and shot-peened to reinforce the structure and minimize the risk of cracks or weld failures.
The bucket's cutting edge is made of special wear-resistant steel, paired with reinforced teeth and side cutters, performing excellently in heavy-duty excavation scenarios.
Thickened steel plates and lateral reinforcement guards offer superior wear resistance, ensuring the equipment remains durable throughout its lifecycle.
The flat-bottom bucket design ensures a perfectly level surface during finishing work, thereby improving the overall quality of the job site.
Optimized visibility features noticeably larger windows that virtually eliminate blind spots, thereby improving operator safety and site efficiency.
The enlarged skylight improves upward visibility and ventilation; all windows use high-strength tempered glass and are equipped with sunshades to reduce glare.
The interior layout follows strict ergonomic principles, placing all controls within natural reach to minimize operator fatigue during long shifts.
Lightweight and responsive control levers ensure easy operation and precision, reducing operator physical strain.
The carefully appointed cab features a high-definition LCD display and premium seat, providing an exceptionally comfortable operating experience.
The integrated HVAC system provides rapid cooling and heating, enabling year-round operation regardless of weather conditions.

The electronic throttle control system intelligently manages engine output, ensuring maximum efficiency and fuel economy under various working conditions.
The intelligent auto-idle function automatically lowers engine speed after 5 seconds of idling, effectively saving fuel and reducing environmental noise.
The multifunction large-screen LCD monitor provides real-time digital feedback on engine status, including speed, temperature, and oil pressure.
Control switches are centrally located on the touchscreen, enabling intuitive navigation and quick function switching.
The machine is equipped with a GPS satellite system, supporting remote diagnostics, fault alerts, and automatic maintenance reminders for proactive fleet management.
The oil filter, pilot filter, fuel filter, and water separator are all located at ground level for quick and easy routine maintenance.
The large-capacity fuel tank extends runtime and reduces downtime caused by frequent refueling.
The spacious onboard toolbox conveniently stores necessary tools and spare parts, keeping everything needed within easy reach.
By selecting premium components, maintenance intervals can be extended, reducing overall operating costs and increasing machine uptime.


| Performance parameters | ||
| Bucket capacity (m³) | 0.4 | |
| Swing speed (rpm) | 0-12 | |
| Maximum climbing angle (°) | 35 | |
| Maximum bucket digging force (KN) | 58 | |
| Maximum arm digging force (KN) | 40 | |
| Engine model | Cummins QSF2.8 | |
| Power/speed (KW/rpm) | 53/2200 | |
| Tire model | - | |
| System pressure (MPa) | 27.5 | |
| Working range | ||
| Maximum digging height (mm) | 7050 | |
| Maximum dumping height (mm) | 5188 | |
| Maximum digging depth (mm) | 4015 | |
| Maximum vertical digging depth (mm) | 3550 | |
| Maximum digging radius (mm) | 6540 | |
| Minimum swing radius (mm) | 2140 | |
| Maximum ground clearance of dozer blade (mm) | 370 | |
| Maximum sinking depth of dozer blade (mm) | 344 | |
| Overall dimensions | ||
| Overall dimensions L*W*H (mm) | 6529*2215*2630 | |
| Cab height (mm) | 2630 | |
| Wheelbase (mm) | 1745 | |
| Track gauge (mm) | 1750 | |
| Minimum ground clearance (mm) | 375 | |
| Tail swing radius (mm) | 1929 | |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.