
Double Drum Road Roller
Delivers reliable output and a long service life, ensuring strong on-site performance.
Equipped with Danfoss piston pumps and motors for stable, efficient, and low-failure operation.
Independent front and rear vibration control improves compaction uniformity and construction efficiency.
Flexible matching for base layers, subbase layers, and asphalt layers to meet diverse engineering needs.
A 30% gradeability ensures stable operation on ramps and inclined sites.
A 200L fuel tank supports long continuous operation and reduces refueling frequency.
Excellent maneuverability for sharp turns, intersections, and curb work.
A minimum clearance of 440 mm reduces underbody scraping and enhances off-road capability.
A 2080 mm drum width increases single-pass coverage and improves construction efficiency.
A full set of safety devices complies with international construction machinery standards.
The D106HF tandem vibratory roller integrates a high-performance Cummins engine, imported hydraulic systems, dual independent vibration, and advanced safety features to deliver professional, efficient, and reliable compaction performance. With dual amplitude, dual frequency, excellent handling, and outstanding operator comfort, it is an ideal choice for highway paving, municipal roads, parking lots, airports, and other infrastructure projects.
| Basic Parameters | |
| Model | D106HF |
| Operating Weight (kg) | 10600 |
| Static Linear Load (Front/Rear) (N/cm) | 249 / 249 |
| Vibration Frequency (Hz) | 42 / 50 |
| Amplitude (mm) | 0.8 / 0.4 |
| Centrifugal Force (kN) | 120 × 2 / 80 × 2 |
| Drum Width (mm) | 2080 |
| Travel Speed (km/h) | 0-11 |
| Gradeability (%) | 30 |
| Ground Clearance (mm) | 440 |
| Steering Angle (°) | ±40 |
| Turning Radius (mm) | 6000 |
| Engine Brand | Cummins |
| Rated Power (kW) | 119 |
| Fuel Tank Capacity (L) | 200 |
| Dimensions L×W×H (mm) | 4920 × 2250 × 3200 |
| Main Configuration | |
| Component | Specification/Brand |
| Engine Model | QSB4.5 (Cummins) |
| Drive Pump | 90R100 / T90R100 (Danfoss) |
| Drive Motor | 90K055×2 (Danfoss) |
| Vibration Pump | MPV046 / MP1P45R (Danfoss) |
| Vibration Motor | MMF035×2 (Danfoss) |
| Reducer | CTU2150×2 (Brevini) |
| Vibration Bearing | 22312×8 (FAG) |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.