
Double Drum Road Roller
Higher operating weight delivers stronger compaction performance and better density for major road projects.
Uniform pressure distribution ensures a smoother surface and higher compaction quality.
Provides deeper and more effective compaction for base and subbase layers.
Better matches different materials and layer thicknesses, improving versatility.
Reliable power, low fuel consumption and compliance with global emission regulations.
Stable hydraulic system with high efficiency, low failure rate and long service life.
Safe, maintenance-free and highly reliable even under heavy loads.
Enables parallel movement for edge compaction and operation in narrow spaces.
Adjustable flow rate, uniform distribution and low water consumption.
Front-mounted console and streamlined body provide a clear view of the drum edges and working area.
The D136HF double-drum vibratory roller is a high-performance 13-ton roller featuring a heavy-duty structure, premium imported components and an optimized vibration system, delivering strong compaction force, high efficiency and excellent reliability. With articulated steering, crab steering, built-in wet brakes and an ergonomic cab, it is ideal for highways, airports, municipal roads and large infrastructure projects.
| Basic Parameters | |
| Model | D136HF |
| Operating Weight (kg) | 13000 |
| Static Linear Load (front/rear) (N/cm) | 299 / 299 |
| Vibration Frequency (Hz) | 42 / 50 |
| Amplitude (mm) | 0.88 / 0.4 |
| Centrifugal Force (kN) | 150 × 2 / 95 × 2 |
| Drum Width (mm) | 2130 |
| Travel Speed (km/h) | 0-12 |
| Gradeability (%) | 30 |
| Ground Clearance (mm) | 440 |
| Steering Angle (°) | ±40 |
| Turning Radius (mm) | 6000 |
| Engine Brand | CUMMINS |
| Rated Power (kW) | 119 |
| Fuel Tank Capacity (L) | 200 |
| Dimensions | |
| Overall Dimensions L×W×H (mm) | 4920 × 2300 × 3200 |
| Main Configuration | |
| Engine Model | QSB4.5 (Cummins) |
| Drive Pump Model | 90R100 / T90R100 (Danfoss) |
| Drive Motor Model | 90K055×2 (Danfoss) |
| Vibration Pump Model | MPV046 / MP1P45R (Danfoss) |
| Vibration Motor Model | MMF035×2 (Danfoss) |
| Reducer Model | CTU2150×2 (Brevini) |
| Vibration Bearing | 22312×8 (FAG) |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.